METODE PELAKSANAAN DAN ANALISIS KEBUTUHAN PERALATAN PADA PEKERJAAN STRUKTUR GEDUNG (STUDI KASUS : PEMBANGUNAN KANTOR PENGADILAN TINGGI TAHAP II BANDA ACEH)
Pengarang
Naufal Hawari - Personal Name;
Dosen Pembimbing
Nomor Pokok Mahasiswa
1904101010056
Fakultas & Prodi
Fakultas Teknik / Teknik Sipil (S1) / PDDIKTI : 22201
Subject
Kata Kunci
Penerbit
Banda Aceh : Fakultas Teknik., 2024
Bahasa
No Classification
-
Literature Searching Service
Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)
Perencanaan dan pelaksanaan pekerjaan struktur adalah hal yang sangat penting dalam proses pembangunan, karena berkaitan langsung dengan keamanan dan keselamatan pengguna bangunan. Pada suatu proyek konstruksi terdapat 5 tolok ukur sukses suatu pengelolaan proyek, yaitu Biaya-Mutu-Waktu-Ku-Puas dan disingkat dengan BMW-KUPUAS. Oleh sebab itu, diperlukan penggunaan metode yang cepat, praktis, tepat, serta aman untuk membantu penyelesaian pekerjaan. Adanya peralatan yang lengkap dapat mempermudah pelaksanaan pekerjaan dan dapat mempersingkat waktu pengerjaan proyek. Dengan demikian, perencanaan metode pelaksanaan, dan analisis kebutuhan peralatan sangat diperlukan agar proyek berjalan dengan optimal. Perencanaan ini berfokus pada metode pelaksanaan pekerjaan dan analisis kebutuhan peralatan pada pekerjaan struktur gedung proyek Pembangunan kantor Pengadilan Tinggi Tahap II Banda Aceh, yaitu pekerjaan tanah dan pondasi, pekerjaan struktur bawah pondasi, pekerjaan lantai dasar, pekerjaan lantai satu. Perencanaan ini menggunakan data sekunder dan dilakukan dengan teknik dokumentasi. Hasil yang didapatkan berupa metode pelaksanaan masing-masing pekerjaan struktur gedung, serta mendapatkan nilai: (a) Jumlah kebutuhan alat berat pada pekerjaan tanah dan pondasi adalah 1 unit tandem roller (5,24 jam) dengan produktivitas 460,65 m3/jam dan 1 unit backhoe loader (10,45 jam) dengan produktivitas 95,45 m3/jam. (b) Jumlah kebutuhan alat berat pada pekerjaan struktur bawah pondasi adalah 3 unit (33 trip) mixer truck (224,87 jam) dengan produktivitas 2,67 m3/jam, dan 1 unit hydraulic static pile driver (10,14 jam) dengan produktivitas 28,75 m3/jam, 1 unit concrete pump (9,68 jam) dengan produktivitas 65,25 m3/jam. (c) Jumlah kebutuhan alat berat pada pekerjaan lantai dasar adalah 3 unit (30 trip) mixer truck (202,39 jam) dengan produktivitas 2,67 m3/jam, dan 1 unit concrete pump (8,67 jam) dengan produktivitas 65,25 m3/jam, 1 unit wheel mounted crane (61,90 jam) dengan produktivitas m3/jam. (d) Jumlah kebutuhan alat berat pada pekerjaan lantai satu adalah 4 unit (12 trip) mixer truck (104,49 jam) dengan produktivitas 2,67 m3/jam, dan 1 unit concrete pump (4,48 jam) dengan produktivitas 65,25 m3/jam.
Planning and implementing structural work is very important in the development process, because it is directly related to the safety and security of building users. In a construction project there are 5 benchmarks for the success of project management, namely Cost-Quality-Time-Satisfaction and abbreviated to BMW-KUPUAS. Therefore, it is necessary to use methods that are fast, practical, precise and safe to help complete the work. Having complete equipment can make work easier and shorten project completion time. Thus, planning implementation methods and analyzing equipment needs are very necessary so that the project runs optimally. This plan focuses on work implementation methods and analysis of equipment requirements for building structure work for the Phase II Banda Aceh High Court office construction project, namely earth and foundation work, sub-foundation structural work, ground floor work, first floor work. This planning uses secondary data and is carried out using documentation techniques. The results obtained are in the form of methods for carrying out each building structure work, as well as obtaining the values: (a) The number of heavy equipment required for earth and foundation work is 1 tandem roller unit (5.24 hours) with a productivity of 460.65 m3/hour and 1 backhoe loader unit (10.45 hours) with a productivity of 95.45 m3/hour. (b) The number of heavy equipment required for sub-foundation structural work is 3 units (33 trips) mixer truck (224.87 hours) with a productivity of 2.67 m3/hour, and 1 unit of hydraulic static pile driver (10.14 hours) with productivity 28.75 m3/hour, 1 concrete pump unit (9.68 hours) with productivity 65.25 m3/hour. (c) The number of heavy equipment required for ground floor work is 3 units (30 trips) mixer truck (202.39 hours) with a productivity of 2.67 m3/hour, and 1 unit of concrete pump (8.67 hours) with a productivity of 65, 25 m3/hour, 1 unit wheel mounted crane (61.90 hours) with productivity m3/hour. (d) The number of heavy equipment required for first floor work is 4 units (12 trips) mixer truck (104.49 hours) with a productivity of 2.67 m3/hour, and 1 unit of concrete pump (4.48 hours) with a productivity of 65, 25 m3/hour.
PERENCANAAN JADWAL MATERIAL PADA PROYEK PEMBANGUNAN GEDUNG BPJS KESEHATAN KANTOR CABANG LANGSA (ABZAR, 2021)
ANALISIS RISIKO KESELAMATAN KONSTRUKSI PADA PROYEK PEMBANGUNAN GEDUNG PERKANTORAN (Cut Nabila Mutiarani, 2023)
ANALISIS LIFE CYCLE COST PADA PROYEK PEMBANGUNAN GEDUNG PENGADILAN TINGGI BANDA ACEH (Sutan Pratama Risman, 2025)
PERBANDINGAN BIAYA DAN WAKTU PELAKSANAAN STRUKTUR RANGKA BAJA TERBUKA DENGAN STRUKTUR SISTEM GANDA (STUDI KASUS PADA GEDUNG MAHKAMAH SYAR'IYAH PROVINSI ACEH DI BANDA ACEH) (Sara Bulis, 2024)
PERENCANAAN JADWAL TENAGA KERJA PADA PROYEK PEMBANGUNAN GEDUNG BPJS KESEHATAN KANTOR CABANG LANGSA (Rohmat Prihanto, 2020)