Electronic Theses and Dissertation
Universitas Syiah Kuala
LAPORAN KERJA PRAKTEK
PROYEK PEMBANGUNAN GEDUNG KANTOR BALAI PEMANTAPAN KAWASAN HUTAN DAN TATA LINGKUNGAN (BPKHTL) WILAYAH XVIII ACEH
Pengarang
BELLA NOVELEA APDANI - Personal Name;
Dosen Pembimbing
Mahmuddin - 196912051997021001 - Dosen Pembimbing I
Nomor Pokok Mahasiswa
2104001010012
Fakultas & Prodi
Fakultas Teknik / Teknik Sipil (D3) / PDDIKTI : 22401
Subject
Kata Kunci
Penerbit
Banda Aceh : ., 2024
Bahasa
No Classification
-
Literature Searching Service
Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)
Kegiatan magang merupakan satu bentuk implementasi program Magang – MBKM (Merdeka Belajar Kampus Merdeka) yang mana suatu kegiatan pembelajaran dilapangan dan bertujuan untuk memperkenalkan dan menumbuhkan kemampuan mahasiswa/i dalam dunia kerja secara riil. Kegiatan Magang ini juga menjadi salah satu syarat mata kuliah wajib bagi mahasiswa/i Program DIII Teknik Sipil. Pembelajaran ini dilaksanakan melalui hubungan yang intensif antara perserta program magang dan perusahaan.
Praktik kerja magang yang ditempatkan pada Divisi 1 Gedung dibawahi langsung oleh PT Brantas Abipraya. Dalam melaksanakan praktik, Divisi 1 Gedung ini hanya memiliki 8 anak magang.
Magang kegiatan yang kami pelajari disana berkaitan dengan proses pengerjaan di lapangan seperti Menghitung kapasitas Pengecoran, alat yang digunakan, metode pekerjaan, permasalahan yang timbul saat pelaksanaan serta cara untuk menyelesaikannya.
Selain itu dari penjelasan pengawas di lapangan, kami mengerti bahwa penjadwalan juga penting dalam pelaksanaan sebuah proyek. Pekerjaan satu dengan yang lainnya saling berkaitan sehingga jika satu pekerjaan tertunda atau terlambat maka dapat mempengaruhi pekerjaan yang lain. Untuk itu dibutuhkan pengawasan dan pengarahan agar bangunan sesuai dengan RKS (rencana kerja dan syarat syarat), gambar kerja dan sesuai dengan jadwal yang telah dibuat.
Setelah mengikuti kegiatan magang selama 3 (Tiga) bulan pada proyek Pembangunan Gedung Kantor BPKHTL Wilayah XVIII Aceh banyak yang dapat dipelajari dan pengalaman tambahan baik dalam segi teori maupun praktek lapangan. Hal ini sangat membantu bagi mahasiswa mempersiapkan diri untuk menghadapi dunia kerja.
Internship activities are a form of implementation of the Internship program - MBKM (Merdeka Belajar Kampus Merdeka) which is a learning activity in the field and aims to introduce and grow students' abilities in the real world of work. This internship activity is also one of the mandatory course requirements for DIII Civil Engineering Program students. This learning is carried out through intensive relationships between internship program participants and companies. Internship work practices placed in Division 1 Building are directly supervised by PT Brantas Abipraya. In carrying out practicals, Division 1 of this building only has 8 interns. The internship activities that we studied there were related to work processes in the field such as calculating casting capacity, tools used, work methods, problems that arise during implementation and ways to solve them. Apart from that, from the supervisor's explanation in the field, we understand that scheduling is also important in implementing a project. One job is related to another so that if one job is delayed or late it can affect other jobs. For this reason, supervision and direction is needed so that the building complies with the RKS (work plan and requirements), work drawings and in accordance with the schedule that has been made. After participating in an internship for 3 (three) months on the BPKHTL Region XVIII Aceh Office Building Construction project, there was a lot to learn and gain additional experience both in terms of theory and field practice. This is very helpful for students to prepare themselves to face the world of work.
PROYEK PEMBANGUNAN GEDUNG KANTOR BALAI PEMANTAPAN KAWASAN HUTAN DAN TATA LINGKUNGAN (BPKHTL) WILAYAH XVIII ACEH (BELLA NOVELEA APDANI, 2024)
PENERAPAN SISTEM PELAPORAN PROYEK SEBAGAI SUATU DASAR PENGENDALIAN MANAJEMEN PADA PROYEK PEMBANGUNAN GEDUNG DAN REHABILITASI SEKOLAH PADA DINAS PENDIDIKAN DAN PENGAJARAN ACEH UTARA (Husniah, 2024)
PENGATURAN TATA RUANG YANG BAIK DALAM MENINGKATKAN RNPRODUKTIVITAS KERJA PEGAWAI KANTOR RNSEKRETARIAT DAERAH ACEH (DESI ALFARISI, 2015)
ANALISIS KEMENANGAN WALHI DALAM GUGATAN TERHADAP PEMBANGUNAN PLTA TAMPUR-I (Shari Riza Lianda, 2025)
ANALISIS PENYEBAB KETERLAMBATAN PELAKSANAAN PEMBANGUNAN INFRASTRUKTUR GEDUNG DI WILAYAH LINTAS BARAT PADA PROVINSI ACEH (Ermawansyah Putra, 2025)