PRARANCANGAN PABRIK N-BUTANOL DARI BUTIRALDEHIDA DAN HIDROGEN MENGGUNAKAN PROSES HIDROGENASI DENGAN KAPASITAS PRODUKSI 25.000 TON/TAHUN | ELECTRONIC THESES AND DISSERTATION

Electronic Theses and Dissertation

Universitas Syiah Kuala

    SKRIPSI

PRARANCANGAN PABRIK N-BUTANOL DARI BUTIRALDEHIDA DAN HIDROGEN MENGGUNAKAN PROSES HIDROGENASI DENGAN KAPASITAS PRODUKSI 25.000 TON/TAHUN


Pengarang

PUTRI NADYA FAHMY - Personal Name;

Dosen Pembimbing

Farid Mulana - 197202081997021001 - Dosen Pembimbing I
Nasrullah - 196805071997021001 - Dosen Pembimbing II



Nomor Pokok Mahasiswa

2004103010091

Fakultas & Prodi

Fakultas Teknik / Teknik Kimia (S1) / PDDIKTI : 24201

Subject
-
Kata Kunci
-
Penerbit

Banda Aceh : Fakultas Teknik., 2024

Bahasa

No Classification

-

Literature Searching Service

Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)

Prarancangan pabrik n-butanol (C4H10O) menggunakan butiraldehida (C4H8O) dan hidrogen (H2) sebagai bahan baku. Pabrik ini dirancang untuk memproduksi n-butanol melalui proses hidrogenasi butiraldehid dengan penggunaan Copper Zinc Oxide (Cu/ZnO) sebagai katalis. Kapasitas produksi pabrik ini adalah 25.000 ton/tahun dengan waktu operasi 330 hari/tahun dan 24 jam/hari. Bentuk perusahaan yang direncanakan adalah Perseroan Terbatas (PT) dengan menggunakan metode struktur organisasi garis dan staf. Kebutuhan tenaga kerja untuk menjalankan perusahaan ini berjumlah 126 orang. Pabrik ini direncanakan didirikan di Kawasan Industri Krakatau Industrial Estate (KIEC), Cilegon, Banten, Jawa Barat dengan luas tanah 17.902 m2. Sumber air pabrik ini berasal dari PT. Krakatau Tirta Industri (KTI), sedangkan listrik diperoleh dari generator diesel dengan daya 869,825 kW.
Hasil analisa ekonomi yang diperoleh adalah sebagai berikut :
a. Fixed Capital Investment (FCI) = Rp 1.128.045.740.217
b. Working Capital Investment (WCI) = Rp 282.011.435.054
c. Total Capital Investment (TCI) = Rp 1.410.057.175.271
d. Total Production Cost (TPC) = Rp 4.761.621.271.986
e. Selling Cost (SC) = Rp 5.260.589.924.352
f. Laba Bersih = Rp 374.226.489.274
g. Pay Out Time (POT) = 5 tahun 9 bulan
h. Break Event Point (BEP) = 41,18%
i. Internal Rate of Return (IRR) = 21,20%
Berdasarkan studi kelayakan teknis dan ekonomis diatas, maka dapat disimpulkan bahwa prarancangan pabrik n-butanol ini layak untuk dilanjutkan ke tahap rancangan.

This preliminary of n-butanol (C4H10O) plant design uses butyraldehyde (C4H8O) and hidrogen (H2) as raw materials. This chemical plant is designed to n-butanol using butyraldehyde hydrogenation process and Copper Zinc Oxide (Cu/ZnO) as the catalyst. The production capacity of this chemical plant is 25.000 tons/year with 330 working days/year and 24 hours/day. The planned form of the company is a Limited Liability Company (PT) using the line and staff organizational structure method with 126 total employees. The location of the plant is planned to be established in Krakatau Industrial Estate (KIEC), Cilegon, Banten, Jawa Barat with a land area of 17.902 m2. The water sources come from PT. Krakatau Tirta Industri (KTI), while the electricity is obtained from a diesel generator with 869,825 kW total power. The results of the economic analysis obtained are as follows: a. Fixed Capital Investment (FCI) = Rp 1.128.045.740.217 b. Working Capital Investment (WCI) = Rp 282.011.435.054 c. Total Capital Investment (TCI) = Rp 1.410.057.175.271 d. Total Production Cost (TPC) = Rp 4.761.621.271.986 e. Selling Cost (SC) = Rp 5.260.589.924.352 f. Net Profit = Rp 374.226.489.274 g. Pay Out Time (POT) = 5 years 9 months h. Break Event Point (BEP) = 41,18% i. Internal Rate of Return (IRR) = 21,20% Based on the technical and economic feasibility studies above, it can be concluded that the preliminary design of the n-butanol plant is feasible to proceed to the design stage.

Citation



    SERVICES DESK