<?xml version="1.0" encoding="UTF-8" ?>
<modsCollection xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" xmlns:slims="http://slims.web.id" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd">
<mods version="3.3" id="121505">
 <titleInfo>
  <title></title>
 </titleInfo>
 <name type="Personal Name" authority="">
  <namePart>Mulia Ailida</namePart>
  <role>
   <roleTerm type="text">Primary Author</roleTerm>
  </role>
 </name>
 <typeOfResource manuscript="no" collection="yes">mixed material</typeOfResource>
 <genre authority="marcgt">bibliography</genre>
 <originInfo>
  <place>
   <placeTerm type="text">Banda Aceh</placeTerm>
   <publisher>Fakultas Teknik</publisher>
   <dateIssued>2008</dateIssued>
  </place>
 </originInfo>
 <language>
  <languageTerm type="code"></languageTerm>
  <languageTerm type="text"></languageTerm>
 </language>
 <physicalDescription>
  <form authority="gmd">Skripsi</form>
  <extent></extent>
 </physicalDescription>
 <note>Predesign  of Bleaching  Earth mill  is used Clay and  Sulfuric  Acid  as raw material.  The production  process is occurred within continue and  it is operated for&#13;
330 days a Year. The compagny system is limited union with line and staff system in&#13;
organization  structural. The mill used  320 peoples as employees. The location for establishing  the mill is planned  in Blang Karing   village,  Ganda Pura  Sub distric, Aceh  Jeumpa  (Bireun)  distric,  Nanggroe  Aceh  Darussalam  Province.  The  water resource for the mill needed will take from Peusangan river which is 8 km far from the mill location,  it is about 2.520,257 KW for electrical needed which  is produced from mill's Generator.&#13;
Based on the economic calculation we find the results are :&#13;
&#13;
&#13;
a.Total capital investment     = Rp. 353.407.616.653,&#13;
&#13;
b.Production cost per year	= = Rp. 4.716.698.887,&#13;
C.	The age of mill	= 20 years&#13;
d.	Break Event Point	= 24,087%&#13;
e.	Internal Rate of Return	= 31,95 %&#13;
f.	Construction time	= 2 years&#13;
The conclution based on the result is the Predesign of Bleaching Earth mill is made of Calcium Bentonit is capable for continuing to the construction step.&#13;
&#13;
&#13;
&#13;
&#13;
&#13;
&#13;
&#13;
&#13;
&#13;
&#13;
&#13;
&#13;
&#13;
&#13;
&#13;
&#13;
&#13;
&#13;
&#13;
</note>
 <note type="statement of responsibility"></note>
 <classification>0</classification>
 <identifier type="isbn"></identifier>
 <location>
  <physicalLocation>ELECTRONIC THESES AND DISSERTATION Universitas Syiah Kuala</physicalLocation>
  <shelfLocator></shelfLocator>
 </location>
 <slims:digitals/>
</mods>
<recordInfo>
 <recordIdentifier>121505</recordIdentifier>
 <recordCreationDate encoding="w3cdtf">2024-03-22 11:44:42</recordCreationDate>
 <recordChangeDate encoding="w3cdtf">2024-03-22 11:44:42</recordChangeDate>
 <recordOrigin>machine generated</recordOrigin>
</recordInfo>
</modsCollection>