PERBANDINGAN BIAYA DAN WAKTU PEKERJAAN PELAT LANTAI KONVENSIONAL DAN PELAT LANTAI FLOORDECK PADA PROYEK PUSDALOPS KOTA BANDA ACEH
Pengarang
NUZUL QADRI - Personal Name;
Dosen Pembimbing
Nomor Pokok Mahasiswa
1704101010076
Fakultas & Prodi
Fakultas Teknik / Teknik Sipil (S1) / PDDIKTI : 22201
Subject
Kata Kunci
Penerbit
Banda Aceh : Fakultas Teknik., 2024
Bahasa
No Classification
-
Literature Searching Service
Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)
Perkembangan teknologi yang semakin canggih mempermudah manusia dalam melakukan suatu pekerjaan. Pelat lantai merupakan pekerjaan kontruksi yang membutuhkan waktu yang lama dalam pembuatannya karena memiliki volume yang besar dibandingkan pekerjaan lain. Dengan adanya inovasi baru untuk meningkatkan kualitas dan kuantititas kerja salah satunya adalah dengan mengganti cara konvensional menjadi modern dengan menggunakan floordeck sebagai besi tulangan positif dan bekisting kayu pada metode konvensional. Lokasi penelitian pada Jalan Tgk Direuleung No 3, Kecamatan Ulee Kareng, Kota Banda Aceh. Tujuan penelitian ini adalah mengetahui besarnya perbandingan biaya dan lamanya waktu pada metode pelat lantai konvensional dan pelat lantai floordeck dengan objek penelitian gedung Pusdalops kota Banda Aceh menggunakan pelat konvensional dalam perencanaanya. Data primer diperoleh dari perusahaan penyedia floordeck dan wiremesh, data sekunder dalam penelitian ini adalah shop drawing bangunan, rencana anggaran biaya, and time schedule. Data kemudian diolah mengggunakan Microsoft Excel. Hasil dari penelitian ini didapatkan biaya pelat konvensional di dapatkan dengar harga Rp.338.385.235,40 sedangkan harga pelat lantai floordeck Rp.238.498.045,10 dengan selisih harga Rp.99.887.190,30 atau lebih murah 30 % dari pekerjaan pelat konvensional. Untuk durasi pekerjaan pelat konvensional membutuhkan waktu 51 hari sedangkan pelat floordeck membutuhkan waktu 12 hari dalam pekerjaanya dengan selisih waktu 39 hari lebih cepat untuk pelat floordeck.
The advancement of increasingly sophisticated technology makes it easier for humans to perform a task. The construction of floor plate is a laborious process, primarily due to their significant volume in comparison to other construction activities. In order to enhance both the quality and quantity of work, one approach is to substitute traditional methods with contemporary ones. This is achieved by employing floordeck as positive reinforcement and wooden formwork in the conventional method. The research is located at Tgk Direuleung street No 3, Ulee Kareng district, Banda Aceh City. The main aim of this study is to determine the amount of cost and time differences between the conventional floor slab method and the floordeck floor slab method with the research object of the Pusdalops building in Banda Aceh city uses conventional slab in its planning. The study obtained primary data from vendors of floordeck and wiremesh materials and secondary data included architectural shop drawing, budget proposal, and time schedule. The data was then processed using Microsoft Excel. The findings from this study reveal a cost disparity between the conventional floor slab and floordeckfloor slab. The cost of conventional floor slab amounted to Rp.338,385,235.40, whereas the floordeck floor slab were priced at Rp. 238,498,045.10, indicating a notable price difference of Rp.99,887,190.30 or a 30% reduction compared to conventional floor slab. Additionally, in terms of the duration of completion, the conventional foor slab work requires 51 days, while the floordeck floor slab can be finalized in just 12 days, resulting in a noteworthy time difference of 39 days faster for floordeck floor slab.
ANALISIS PERBANDINGAN RENCANA BIAYA PELAT LANTAI BONDEK DAN PELAT LANTAI KONVENSIONALRN(STUDI KASUS: PEMBANGUNAN AULA KODAM ISKANDAR MUDA) (T. FAKHRUL JUANDA, 2024)
ANALISIS PERILAKU PELAT LANTAI KOMPOSIT FLOORDECK ANTARA BETON NORMAL DAN BETON RINGAN BUSA (AYU LESTARI PURBA, 2014)
PROYEK LANJUTAN KDP (KONSTRUKSI DALAM PENGERJAAN) UNIVERSITAS SYIAH KUALA (BADRYAN NAVIS, 2025)
ANALISIS PERILAKU PELAT LANTAI KOMPOSIT FLOORDECK BETON RINGAN BUSA MUTU 35 MPA DENGAN KETEBALAN 10 CM, 12 CM, DAN 14 CM (Cut Riska Irnanda, 2014)
PERENCANAAN STRUKTUR GEDUNG KANTOR SEWA BERLANTAI SEPULUH DENGAN MENGGUNAKAN PROGRAM SAP2000 (Teuku Farizal, 2024)