PRA RANCANGAN PABRIK MAGNESIUM SULFAT HEPTAHIDRAT DARI DOLOMIT DAN ASAM SULFAT MENGGUNAKAN PROSES LEACHING DENGAN KAPASITAS PRODUKSI 100.000 TON/TAHUN | ELECTRONIC THESES AND DISSERTATION

Electronic Theses and Dissertation

Universitas Syiah Kuala

    SKRIPSI

PRA RANCANGAN PABRIK MAGNESIUM SULFAT HEPTAHIDRAT DARI DOLOMIT DAN ASAM SULFAT MENGGUNAKAN PROSES LEACHING DENGAN KAPASITAS PRODUKSI 100.000 TON/TAHUN


Pengarang

Dhea Fahira - Personal Name;

Dosen Pembimbing

Yanna Syamsuddin - 196901131998022001 - Dosen Pembimbing I
Muhammad Zaki - 196503071992031003 - Dosen Pembimbing II



Nomor Pokok Mahasiswa

1904103010053

Fakultas & Prodi

Fakultas Teknik / Teknik Kimia (S1) / PDDIKTI : 24201

Subject
-
Kata Kunci
-
Penerbit

Banda Aceh : Fakultas Teknik., 2024

Bahasa

No Classification

-

Literature Searching Service

Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)


Prarancangan pabrik magnesium sulfat heptahidrat (MgSO4.7H2O) menggunakan dolomit (Ca.Mg(CO3)2) dan asam sulfat (H2SO4) sebagai bahan baku. Kapasitas produksi sebesar 100.000 ton/tahun dengan waktu operasi 330 hari/tahun dan waktu 24 jam/hari. Pabrik ini direncanakan dibangun di Desa Pongangan Krajan, Kecamatan Manyar, Kabupaten Gresik, Jawa Timur, Indonesia dengan luas area pabrik 30.460 m2. Bentuk perusahaan yang direncanakan adalah Perseroan Terbatas (PT) dengan menggunakan metode struktur organisasi garis dan staf dan tenaga kerja sebanyak 144 orang. Kebutuhan air untuk pabrik berasal dari Sungai Brantas dengan laju alir 56.646,618 kg/jam, dan untuk kebutuhan listrik diperoleh dari generator dengan daya 1.016,233 kW. Hasil analisis ekonomi diperoleh sebagai berikut:
a. Fixed Capital Investmen (FCI) = Rp 1.217.309.580.997,-
b. Working Capital Investment (WCI) = Rp. 304.327.395.249.-
c. Total Capital Investment (TCI) = Rp. 1.521.636.976.247.-
d. Total Production Cost (TPC) = Rp. 44.931.995.467.653.-
e. Selling Price (SP) = Rp. 45.612.996.662.549.-
f. Laba bersih = Rp. 510.750.896.172.-
g. Pay Out Time (POT) = 3,2 Tahun
h. Break Even Point (BEP) = 44%
i. Internal Rate of Return (IRR) = 32%
j. Rate of Return (ROR) = 34%
Berdasarkan studi kelayakan teknis dan ekonomis diatas, maka dapat disimpulkan bahwa Prarancangan Pabrik Magnesium Sulfat Heptahidrat ini layak untuk dilanjutkan ke tahap rancangan.

This preliminary of magnesium sulfate heptahydrate (MgSO4.7H2O) plant design uses dolomite (Ca.Mg(CO3)2) and sulphuric acid (H2SO4) as raw materials. The production capacity is 100.000 tons/year with an operating time of 330 working days/year and 24 hours/day. This factory is planned to be built in Pongangan Krajan Village, Manyar District, Gresik Regency, Jawa Timur, Indonesia with a factory area of 28.600 m2. The planned form of the company is a Limited Liability Company (PT) using the line organizational structure method and a workforce of 144 people. The air requirement for the factory comes from the Brantas River with a flow rate of 56.646,618 kg/hour, and for electricity needs it is obtained from a generator with a power of 1016,233 kW. The results of the economic analysis are obtained as follows: a. Fixed Capital Investmen (FCI) = Rp. 1.217.309.580.997.- b. Working Capital Investment (WCI) = Rp. 304.327.395.249.- c. Total Capital Investment (TCI) = Rp. 1.521.636.976.247.- d. Total Production Cost (TPC) = Rp. 44.931.995.467.653.- e. Selling Price (SP) = Rp. 45.612.996.662.549.- f. Laba bersih = Rp. 510.750.896.172.- g. Pay Out Time (POT) = 3,2 Tahun h. Break Even Point (BEP) = 44% i. Internal Rate of Return (IRR) = 32% j. Rate of Return (ROR) = 34% Based on the technical and economic feasibility studies above, it can be concluded that the Preliminary Plant Design of the magnesium sulfate heptahydrate Plant is feasible to proceed to the design stage.

Citation