PRARANCANGAN PABRIK BIODIESEL 40% FAME (FATTY ACID METHYL ESTER) DARI RBDPO (REFINED BLEACHED DEODORIZED PALM OIL) DENGAN KAPASITAS PRODUKSI 400.000 TON/TAHUN. | ELECTRONIC THESES AND DISSERTATION

Electronic Theses and Dissertation

Universitas Syiah Kuala

    SKRIPSI

PRARANCANGAN PABRIK BIODIESEL 40% FAME (FATTY ACID METHYL ESTER) DARI RBDPO (REFINED BLEACHED DEODORIZED PALM OIL) DENGAN KAPASITAS PRODUKSI 400.000 TON/TAHUN.


Pengarang

Rima Aidi Baity - Personal Name;

Dosen Pembimbing

Cut Meurah Rosnelly - 196801091994032003 - Dosen Pembimbing I
T. Maimun - 195911261991021001 - Dosen Pembimbing I



Nomor Pokok Mahasiswa

1904103010082

Fakultas & Prodi

Fakultas Teknik / Teknik Kimia (S1) / PDDIKTI : 24201

Penerbit

Banda Aceh : Fakultas Teknik., 2024

Bahasa

Indonesia

No Classification

660

Literature Searching Service

Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)

Prarancangan pabrik Biodiesel ini menggunakan bahan baku dari
RBDPO(Refinery Bleached Deodorized Palm Oil) dan Diesel 40%. Kapasitas
produksi pabrik ini adalah 400.000 Ton/Tahun dengan hari kerja 330 hari/tahun.
Pabrik ini direncanakan didirikan di Air Masin, Kec. Seuruway, Kabupaten Aceh
Tamiang, Aceh, dengan luas tanah 22.169 m2
. Bentuk perusahaan yang
direncanakan adalah Perseroan Terbatas (PT) dengan menggunakan metode
struktur organisasi garis dan staf (tenaga kerja sebanyak 97 orang). Sumber air
pabrik ini berasal dari sungai kuruk seruway, Kabupaten Aceh Tamiang, Provinsi
Aceh dengan total kebutuhan air sebesar 505.895.458 kg/jam, dan untuk kebutuhan
listrik diperoleh dari Perusahaan Listrik Negara (PLN) dan generator dengan daya
89.316,51 kW/ hari.
Hasil analisa ekonomi yang diperoleh adalah sebagai berikut:
1. Fixed Capital Investment (FCI) = Rp. 464.319.418.575,-
2. Working Capital Investment (WCI) = Rp. 116.079.854.643,-
3. Total Capital Investment (TCI) = Rp. 580.399.273.219,-
4. Total Production Cost (TPC) = Rp. 11.532.062.067.478,-
5. Sales Cost (SC) = Rp. 11.843.612.334.630,-
6. Laba Bersih = Rp. 269.490.981.086,-
7. Pay Out Time (POT) = 2,1 tahun
8. Break Event Point (BEP) = 73,42 %
9. Internal Rate of Return (IRR) = 30,15 %
10. Rate of Return (ROR) = 46 %
Berdasarkan studi kelayakan teknis dan ekonomi di atas, maka dapat
disimpulkan bahwa Prarancangan Pabrik B40 ini layak untuk dilanjutkan ke tahap
konstruksi.

Biodiesel plant design uses RBDPO (Refined Bleached Deodorized Palm Oil) and 40% Diesel as raw materials. The production capacity of this factory is 400.000 tons/year with 330 working days/year. The location of the factory is planned to be established in Air Masin Air Masin, Seuruway District, Aceh Tamiang Regency, Aceh with a land area of 22.169 m2. The planned form of this company is an Incorporated (Inc.) using the line and staff structure method (a workforce of 97 people). The water source for this factory comes from the Kuruk Seriway River, Aceh Tamiang Regency, Aceh Province with total water needed is 505.895.458 kg/hour, and for electricity needs it is obtained from the State Electricity Company (PLN) and a generator with a power of 89.316,51 kW. The results of the economic analysis obtained are as follows: 1. Fixed Capital Investment (FCI) = Rp. 464.319.418.575,- 2. Working Capital Investment (WCI) = Rp. 116.079.854.643,- 3. Total Capital Investment (TCI) = Rp. 580.399.273.219,- 4. Total Production Cost (TPC) = Rp. 11.532.062.067.478,- 5. Sales Cost (SC) = Rp. 11.843.612.334.630,- 6. Laba Bersih = Rp. 269.490.981.086,- 7. Pay Out Time (POT) = 2,1 tahun 8. Break Event Point (BEP) = 73,42 % 9. Internal Rate of Return (IRR) = 30,15 % 10. Rate of Return (ROR) = 46 % Based on the technical and economic feasibility study above, it can be concluded that the Biodiesel Factory Design is feasible to proceed to the construction stage.