PRARANCANGAN PABRIK ANTRAKUINON DENGAN KAPASITAS PRODUKSI 60.000 TON/TAHUN
Pengarang
Azzahra Iskandar Putri - Personal Name;
Dosen Pembimbing
Lia Mairiza - 197405232000032001 - Dosen Pembimbing I
Syaubari - 196508041992031002 - Dosen Pembimbing II
Yunardi - 196009151988101001 - Penguji
Hisbullah - 197007131997021002 - Penguji
Mukramah - 199206102020011101 - Penguji
Nomor Pokok Mahasiswa
1904103010067
Fakultas & Prodi
Fakultas Teknik / Teknik Kimia (S1) / PDDIKTI : 24201
Subject
Kata Kunci
Penerbit
Banda Aceh : Fakultas Teknik., 2024
Bahasa
No Classification
-
Literature Searching Service
Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)
Prarancangan pabrik antrakuinon (C14H8O2¬) menggunakan ftalat anhidrida (C8H4O3¬), benzena (C6H6), aluminum klorida (AlCl3), dan asam sulfat (H2SO4) sebagai bahan baku. Proses produksi secara keseluruhan menggunakan proses Friedel Craft. Kapasitas produksi sebesar 60.000 ton/tahun dengan waktu operasi 330 hari/tahun dan waktu 24 jam/hari. Pabrik ini direncanakan dibangun di Desa Pongangan Krajan, Kecamatan Manyar, Kabupaten Gresik, Jawa Timur, Indonesia dengan luas area pabrik 25.623 m2. Bentuk perusahaan yang direncanakan adalah Perseroan Terbatas (PT) dengan menggunakan metode struktur organisasi garis dan staf dan tenaga kerja sebanyak 144 orang. Kebutuhan air untuk pabrik berasal dari Sungai Bengawan Solo dengan laju alir 89.810 kg/jam, dan untuk kebutuhan listrik diperoleh dari generator dengan daya 970,67 kW. Hasil analisis ekonomi diperoleh sebagai berikut:
1. Fixed Capital Investment (FCI) = Rp 869.799.095.777,-
2. Working Capital Investment (WCI) = Rp 217.449.773.944,-
3. Total Capital Investment (TCI) = Rp 1.087.248.869.722,-
4. Total Production Cost (TPC) = Rp 16.141.894.169.521,-
5. Selling Price (S) = Rp 16.700.569.436.335,-
6. Laba Bersih = Rp 419.006.450.110,-
7. Pay Out Time (POT) = 2,8 tahun
8. Break Event Point (BEP) = 35,69%
9. Internal Rate of Return (IRR) = 36,47%
Berdasarkan studi kelayakan teknis dan ekonomis diatas, maka dapat disimpulkan bahwa Prarancangan Pabrik Antrakuinon ini layak untuk dilanjutkan ke tahap rancangan.
This preliminary of anthraquinone (C14H8O2¬) plant design uses phthalic anhydride (C8H4O3¬), benzene (C6H6), aluminum chloride (AlCl3), dan sulphuric acid (H2SO4) as raw materials. The overall production process uses a Friedel Craft process. The production capacity is 60.000 tons/year with an operating time of 330 working days/year and 24 hours/day. This factory is planned to be built in Pongangan Krajan Village, Manyar District, Gresik Regency, Jawa Timur, Indonesia with a factory area of 25.623 m2. The planned form of the company is a Limited Liability Company (PT) using the line organizational structure method and a workforce of 144 people. The air requirement for the factory comes from the Bengawan Solo River with a flow rate of 89.810 kg/hour, and for electricity needs it is obtained from a generator with a power of 970.67 kW. The results of the economic analysis are obtained as follows: 1. Fixed Capital Investment (FCI) = Rp 869.799.095.777,- 2. Working Capital Investment (WCI) = Rp 217.449.773.944,- 3. Total Capital Investment (TCI) = Rp 1.087.248.869.722,- 4. Total Production Cost (TPC) = Rp 16.141.894.169.521,- 5. Selling Price (S) = Rp 16.700.569.436.335,- 6. Net Profit = Rp 419.006.450.110,- 7. Pay Out Time (POT) = 2,8 tahun 8. Break Event Point (BEP) = 35,69% 9. Internal Rate of Return (IRR) = 36,47% Based on the technical and economic feasibility studies above, it can be concluded that the Preliminary Plant Design of the Anthraquinone Plant is feasible to proceed to the design stage.
PRARANCANGAN PABRIK ANTRAKUINON DENGAN KAPASITAS PRODUKSI 60.000 TON/TAHUN (Citra Aura Jovial, 2024)
PRARANCANGAN PABRIK NATRIUM ALGINAT DARI RUMPUT LAUT COKLAT DENGAN KAPASITAS PRODUKSI 2000 TON/TAHUN (Muhammad Hafizullah, 2024)
PRARANCANGAN PABRIK NATRIUM ALGINAT (NA-ALGINAT) DARI RUMPUT LAUT COKLAT (PHAEOPHYCEAE) DENGAN PROSES EKTRAKSI KAPASITAS PRODUKSI 2000 TON/TAHUN (Purnamawan, 2024)
PRARANCANGAN PABRIK PORTLAND COMPOSITE CEMENT DE.NGAN KAPASITAS PRODUKSI 2JUTA TON/TAHUN (Rahmat Yani, 2024)
PRARANCANGAN PABRIK KALSIUM SULFAT HEMIHIDRAT DARI BATU GYPSUM DENGAN KAPASITAS PRODUKSI 250.000 TON/TAHUN (Syahfitri Wahyudi, 2024)