PERATAAN SUMBER DAYA TENAGA KERJA PROYEK PADA PEMBANGUNAN GEDUNG RAWAT INAP RUMAH SAKIT UMUM DAERAH (RSUD) KOTA SABANG
Pengarang
Cut Nadia Balqish - Personal Name;
Dosen Pembimbing
Buraida - 196809211999032002 - Dosen Pembimbing I
Said Amir Azan - 197305221998021002 - Dosen Pembimbing II
Nomor Pokok Mahasiswa
1904101010134
Fakultas & Prodi
Fakultas Teknik / Teknik Sipil (S1) / PDDIKTI : 22201
Subject
Kata Kunci
Penerbit
Banda Aceh : Fakultas Teknik Sipil., 2023
Bahasa
No Classification
-
Literature Searching Service
Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)
Pelaksanaan infrastruktur suatu bangunan tidak terlepas dari penggunaan sumber daya tenaga kerja untuk menghasilkan mutu bangunan sesuai dengan standar yang diharapkan. Proyek konstruksi yang sukses membutuhkan penggunaan sumber daya tenaga kerja yang efisien dengan cara mengurangi jumlah tenaga kerja serta meminimumkan waktu menganggur dari tenaga kerja yang ada. Tenaga Kerja merupakan salah satu unsur yang sangat penting dalam pelaksanaan proyek. Sering dijumpai adanya pemborosan tenaga kerja yang disebabkan tidak meratanya tenaga kerja dalam tiap-tiap item pekerjaan. Maka, dibutuhkan suatu usaha untuk meminimumkan fluktuasi yang terjadi. Dalam hal ini, Proyek yang ditinjau yaitu pembangunan gedung rawat inap (RSUD) Kota Sabang. Pada proyek ini dapat dilihat bagaimana cara penggunaan Resources Levelling untuk mengubah Overallocated Resource sehingga menghasilkan penggunaan tenaga kerja yang merata. Data yang digunakan pada perataan ini di analisa dengan menggunakan Software Microsoft Project. Selanjutnya dari hasil pengolahan data diperoleh schedule yang terbaik untuk penjadwalan proyek Pembangunan Proyek Rumah Sakit Umum Daerah (RSUD) Kota Sabang, yaitu start pada tanggal 02 Agustus 2021 dan Finish pada tanggal 29 Desember 2021 dengan durasi selama 150 hari kalender. Kemudian dari program Microsoft Project ini diperoleh Penggunaan tenaga kerja maksimum adalah 123 orang pekerja dan 75 orang tukang pada mingguu ke-18 yaitu tanggal 29 November 2021 sampai dengan 05 Desember 2021 serta minimum tenaga kerja pada mingguu ke-1 tanggal 02 – 08 Agustus 2021 dengan jumlah masing-masing pekerja dan tukang adalah 4 orang. Juga diperoleh jumlah tenaga kerja yang sama pada saat perencanaan dan setelah perataan yaitu pekerja 1.067 orang dan tukang 640 orang.
Kata kunci: Tenaga Kerja, Resource Levelling, Proyek konstruksi
Implementation of the infrastructure of a building is inseparable from the use of labor resources to produce the quality of the building in accordance with the expected standards. A successful construction project requires the efficient use of labor resources by reducing the number of workers and minimizing the idle time of existing workers. Labor is one of the crucial elements in project implementation. It is often found that there is a waste of labor due to uneven distribution of labor in each work item. Therefore, efforts are needed to minimize fluctuations that occur. In this case, the reviewed project is the construction of an inpatient building at the Sabang City General Hospital (RSUD). In this project, we can see how Resources Leveling is used to transform Overallocated Resources to achieve even distribution of labor. The data used in this leveling is analyzed using Microsoft Project Software. Subsequently, from the data processing results, the best schedule for the construction project of the Sabang City Regional General Hospital (RSUD) is obtained, starting on August 2, 2021, and finishing on December 29, 2021, with a duration of 150 calendar days. Then, from this Microsoft Project program, the maximum labor usage is obtained, with 123 workers and 75 craftsmen in the 18th week, from November 29, 2021, to December 5, 2021. The minimum labor usage is in the 1st week, from August 2 to August 8, 2021, with 4 workers and craftsmen each. The same number of workers is obtained during both the planning and leveling stages, which is 1,067 workers and 640 craftsmen. Keywords: Labor, Resource Levelling, Counstruction Projet
GAMBARAN BEBAN KERJA PERAWAT DI RUANG RAWAT INAP JEUMPA RUMAH SAKIT UMUM DAERAH DR. ZAINOEL ABIDIN BANDA ACEH (Dewi Susanti, 2015)
DIMENSI KEPEMIMPINAN SPIRITUAL KEPALA RUANG RAWAT INAP RUMAH SAKIT UMUM DAERAH MEURAXA KOTA BANDA ACEH (Narawidya Safputri, 2017)
ANALISIS KUALITAS PELAYANAN JASA KESEHATAN DIINSTALASI RAWAT INAP DENGAN MENGGUNAKAN METODE SERVQUAL – FUZZY ( STUDI KASUS PADA RUMAH SAKIT UMUM DAERAH MEURAXA KOTA BANDA ACEH ) (Ahlul Rizal, 2017)
KAJIAN PEMELIHARAAN BANGUNAN GEDUNG RUMAH SAKIT UMUM DAERAH MEURAXA KOTA BANDA ACEH (SITI AMALIZA RIDWAN, 2019)
HUBUNGAN BUDAYA ORGANISASI DENGAN KINERJA PERAWAT PELAKSANA DI RUANG RAWAT INAP RUMAH SAKIT BANDA ACEH (USI RETNO ZULYANTY, 2021)