PRARANCANGAN PABRIK BETA KAROTEN DARI CRUDE PALM OIL (CPO) DENGAN KAPASITAS PRODUKSI 1000 TON/TAHUN.
Pengarang
Selly Gita Amelia - Personal Name;
Dosen Pembimbing
Fachrul Razi - 197610182006041003 - Dosen Pembimbing I
Syahiddin DS - 195512051987021001 - Dosen Pembimbing II
Nomor Pokok Mahasiswa
1904103010061
Fakultas & Prodi
Fakultas Teknik / Teknik Kimia (S1) / PDDIKTI : 24201
Subject
Kata Kunci
Penerbit
Banda Aceh : Fakultas Teknik., 2023
Bahasa
No Classification
-
Literature Searching Service
Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)
Prarancangan pabrik Beta karoten ini menggunakan bahan baku crude palm
oil (CPO). Kapasitas produksi pabrik ini adalah 1000 Ton/Tahun dengan hari kerja
330 hari/tahun. Pabrik ini direncanakan didirikan di Kawasan Industri Medan
(KIM), Kecamatan Belawan, Provinsi Sumatera Utara dengan luas tanah 6.277 m2
.
Bentuk perusahaan yang direncanakan adalah Perseroan Terbatas (PT) dengan
menggunakan metode struktur organisasi garis dan staf (tenaga kerja sebanyak 67
orang). Sumber air pabrik ini berasal dari Sungai Pegatalan, Kabupaten Belawan,
Provinsi Sumatera Utara dengan total kebutuhan air sebesar 44.995,25 kg/jam, dan
untuk kebutuhan listrik diperoleh dari Perusahaan Listrik Negara (PLN) dan
generator dengan daya 2.531,05 kWh.
Hasil analisa ekonomi yang diperoleh adalah sebagai berikut:
1. Fixed Capital Investment (FCI) = Rp. 818,878,603,039
2. Working Capital Investment (WCI) = Rp. 144,507,988,771
3. Total Capital Investment (TCI) = Rp. 963,386,591,811
4. Total Production Cost (TPC) = Rp. 4,387,308,532,893
5. Sales Cost (SC) = Rp. 4,816,684,445,957
6. Laba Bersih = Rp. 322,031,934,797
7. Pay Out Time (POT) = 3,08 tahun
8. Break Event Point (BEP) = 42,65 %
9. Internal Rate of Return (IRR) = 19,93 %
10. Rate of Return (ROR) = 33 %
Beta carotene plant design uses crude palm oil as raw materials. The production capacity of this factory is 1.000 tons/year with 330 working days/year. The location of the factory is planned to be established in Belawan District, North Sumatra Province with a land area of 6.277 m2. The planned form of this company is an Incorporated (Inc.) using the line and staff structure method (a workforce of 67 people). The water source for this factory comes from the Pegatalan River, Belawan District, North Sumatra Province with a total water needed is 44.995,25 kg/hour, and for electricity needs it is obtained from the State Electricity Company (PLN) and a generator with a power of 2.531,05 kWh. The result of the economic analysis obtained are as follows: 1. Fixed Capital Investment (FCI) = Rp. 818,878,603,039 2. Working Capital Investment (WCI) = Rp. 144,507,988,771 3. Total Capital Investment (TCI) = Rp. 963,386,591,811 4. Total Production Cost (TPC) = Rp. 4,387,308,532,893 5. Sales Cost (SC) = Rp. 4,816,684,445,957 6. Net Profit = Rp. 322,031,934,797 7. Pay Out Time (POT) = 3,08 tahun 8. Break Event Point (BEP) = 42,65 % 9. Internal Rate of Return (IRR) = 19,93 % 10. Rate of Return (ROR) = 33 %
PRARANCANGAN PABRIK KAROTEN DARI CRUDE PALM OIL (CPO) DENGAN KAPASITAS PRODUKSI 5000 TON/TAHUN (Sufi Humaira S, 2016)
PRA RANCANGAN PABRIK CRUDE PALM OIL (CPO) MENGGUNAKAN CONTINUOUS STERILIZER DENGAN KAPASITAS PRODUKSI 50.000 TON/TAHUN (Fachri Ramadhan, 2016)
PRA RANCANGAN PABRIK CRUDE PALM OIL (CPO) MENGGUNAKAN CONTINUOUS STERILIZER DENGAN KAPASITAS PRODUKSI 50.000 TON/TAHUN (Faisal Rinal Siregar, 2016)
PRARANCANGAN PABRIK BETA KAROTEN DARI CRUDE PALM OIL (CPO) DENGAN KAPASITAS PRODUKSI 1000 TON/TAHUN. (Selly Gita Amelia, 2023)
PRARANCANGAN PABRIK BETA KAROTEN DARI CRUDE PALM OIL DENGAN KAPASITAS PRODUKSI 1000 TON/TAHUN (Dhafratun Ulya, 2023)