Electronic Theses and Dissertation
Universitas Syiah Kuala
SKRIPSI
PENERAPAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) UNTUK MENENTUKAN STRATEGI PENJADWALAN PERAWATAN LINI PRODUKSI GOSS COMMUNITY (STUDI KASUS: PT ACEH MEDIA GRAFIKA)
Pengarang
Al Haris Ramadhan - Personal Name;
Dosen Pembimbing
Friesca Erwan - 198405172019011101 - Dosen Pembimbing I
Riski Arifin - 199505272022031011 - Dosen Pembimbing II
Nomor Pokok Mahasiswa
1904106010019
Fakultas & Prodi
Fakultas Teknik / Teknik Industri (S1) / PDDIKTI : 26201
Subject
Kata Kunci
Penerbit
Banda Aceh : Fakultas Teknik., 2023
Bahasa
No Classification
-
Literature Searching Service
Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)
PT Aceh Media Grafika merupakan perusahaan yang bergerak dibidang industri percetakan yang memproduksi surat kabar, majalah, buku, kalender, kop surat dan segala jenis cetakan lainnya. Dalam proses produksi surat kabar, PT Aceh Media Grafika menggunakan unit Goss Community yang telah beroperasi selama tahun 2005. Berdasarkan observasi, unit Goss Community sering mengalami kerusakan dan perusahaan masih menggunakan corrective maintenance dalam melakukan perbaikan atau perawatan. Berdasarkan permasalahan tersebut, penelitian ini melakukan pengembangan sistem perawatan dan pemeliharaan unit Goss Community menggunakan metode Reliability Centered Maintenance (RCM). Metode ini bertujuan untuk memilih tindakan perawatan yang efektif dan efisien terhadap komponen yang mengalami kerusakan. Dari hasil pengumpulan data, terdapat 3 kerusakan komponen yang paling kritis yang berpotensti menyebabkan shutdown yaitu paper roll stand, blanket gusset roller, dan as roll kertas angin. Berdasarkan hasil pengolahan data diperoleh pemilihan tindakan condition directed pada failure mode yaitu, paper roll stand, blanket gusset roller, dan as roll kertas angin. Berdasarkan hasil pengolahan data dan analisis, penelitian ini menyusun tindakan perawatan yang diperlukan bagi perusahaan dan melakukan penentuan waktu penjadwalan perawatan komponen kritis.
Kata kunci: Reliability Centered Maintenance (RCM), Failure Mode Effect and Analysis (FMEA), Risk Priority Number (RPN), Logic Tree Analysis (LTA)
PT Aceh Media Grafika is a company engaged in the printing industry which produces newspapers, magazines, books, calendars, letterheads and all other types of printing. In the process of producing newspapers, PT Aceh Media Grafika uses the Goss Community unit which has been operating since 2005. Based on observations, the Goss Community unit often experiences damage and the company still uses corrective maintenance in carrying out repairs or maintenance. Based on these problems, this study developed a care and maintenance system for the Goss Community unit using the Reliability Centered Maintenance (RCM) method. This method aims to select effective and efficient maintenance measures for damaged components. From the results of data collection, there are 3 most critical component failures that have the potential to cause shutdown, namely the paper roll stand, blanket gusset roller, and paper roll axle. Based on the results of data processing, it was obtained that the selection of condition-directed actions in the failure mode, namely, paper roll stands, blanket gusset rollers, and paper roll axles. Based on the results of data processing and analysis, this study compiles the necessary maintenance actions for the company and determines the time for scheduling maintenance of critical components. Keywords: Reliability Centered Maintenance (RCM), Failure Mode Effect and Analysis (FMEA), Risk Priority Number (RPN), Logic Tree Analysis (LTA)
PERENCANAAN PENJADWALAN MAINTENANCE UNTUK RNMENINGKATKAN KEANDALAN PADA LINI PENGEMASAN RNDENGAN MENGGUNAKAN METODE RNRELIABILITY CENTERED MAINTENANCE (RCM) RN(STUDI KASUS: PT. MAXMASTER INDONESIA MEDAN) (ALIF ALWANDA, 2025)
PERENCANAAN PERAWATAN MESIN MENGGUNAKAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) PADA MESIN CONVEYOR AREA BATCHING PLANT BETON (STUDI KASUS DI PT. LHOKNGA BETON) (Abdul Fauzan Darkita, 2019)
PERENCANAAN PENJADWALAN PERBAIKAN UNTUK MENINGKATKAN KEANDALAN PADA MESIN CNC PLASMA CUTTING DENGAN MENGGUKANAN METODE RELIABILITY CENTERED MAINTENANCE(RCM) (STUDI KASUS CV. HILUX 57 STEEL) (KHAIRUL MULUK, 2026)
INTEGRASI RELIABILITY CENTERED MAINTENANCE (RCM) DAN TOTAL PRODUCTIVE MAINTENANCE (TPM) PADA INSTALASI COLD AMMONIA PUMP 61-124 J (STUDI KASUS : PT. PUPUK ISKANDAR MUDA ACEH) (ABDUL HANIF, 2019)
ANALISA EFEKTIVITAS DAN USULAN PERBAIKAN PADA MESIN PEMBANGKIT LISTRIK TENAGA DIESEL DENGAN MENGGUNAKAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) (Rizkia Ramadhan, 2017)