<?xml version="1.0" encoding="UTF-8" ?>
<modsCollection xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" xmlns:slims="http://slims.web.id" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd">
<mods version="3.3" id="113791">
 <titleInfo>
  <title></title>
 </titleInfo>
 <name type="Personal Name" authority="">
  <namePart>Rizki Wahidi</namePart>
  <role>
   <roleTerm type="text">Primary Author</roleTerm>
  </role>
 </name>
 <typeOfResource manuscript="no" collection="yes">mixed material</typeOfResource>
 <genre authority="marcgt">bibliography</genre>
 <originInfo>
  <place>
   <placeTerm type="text">Banda Aceh</placeTerm>
   <publisher>Fakultas Teknik Kimia</publisher>
   <dateIssued>2023</dateIssued>
  </place>
 </originInfo>
 <language>
  <languageTerm type="code"></languageTerm>
  <languageTerm type="text"></languageTerm>
 </language>
 <physicalDescription>
  <form authority="gmd">Skripsi</form>
  <extent></extent>
 </physicalDescription>
 <note>Prarancangan pabrik Metanol ini menggunakan gas alam sebagai bahan baku. Kapasitas produksi pabrik Metanol ini adalah 700.000 ton/tahun dengan hari kerja yaitu 330 hari/tahun, Bentuk perusahaan yang direncanakan adalah Perseroan Terbatas (PT) dengan menggunakan metode struktur garis dan staf. Kebutuhan tenaga kerja untuk menjalankan perusahaan ini berjumlah 130 orang. Pabrik Metanol ini direncakan berlokasi di Iskandar Muda Industrial Area (IMIA), Kabupaten Aceh Utara, Provinsi Aceh dengan luas tanah 51.211 m2. Sumber air pabrik metanol berasal dari Sungai Peusangan, Provinsi Aceh dan untuk memenuhi kebutuhan listrik diperoleh dari Perusahaan Listrik Negara (PLN) dan generator dengan daya 85.465,02 kW .&#13;
Hasil analisa ekonomi yang diperoleh sebagai berikut:&#13;
a)	Fixed Capital Investment (FCI)		= Rp. 2.533.140.941.676&#13;
b)	Working Capital Investment (WCI)	= Rp. 633.285.235.419&#13;
c)	Total Capital Investment (TCI)		= Rp. 3.166.426.177.095&#13;
d)	Total Production Cost (TPC)		= Rp. 4.614.626.737.258&#13;
e)	Sales					= Rp. 5.695.948.142.270&#13;
f)	Laba Bersih				= Rp. 810.991.053.758&#13;
g)	Pay Out Time (POT)			= 4,85 tahun&#13;
h)	Break Event Point (BEP)			= 40,02 %&#13;
i)	Internal Rate of Return (IRR)		= 21,5 %&#13;
j)	Rate Of Return (ROR)			= 25,61 %&#13;
</note>
 <note type="statement of responsibility"></note>
 <classification>0</classification>
 <identifier type="isbn"></identifier>
 <location>
  <physicalLocation>ELECTRONIC THESES AND DISSERTATION Universitas Syiah Kuala</physicalLocation>
  <shelfLocator></shelfLocator>
 </location>
 <slims:digitals/>
</mods>
<recordInfo>
 <recordIdentifier>113791</recordIdentifier>
 <recordCreationDate encoding="w3cdtf">2023-08-29 14:37:14</recordCreationDate>
 <recordChangeDate encoding="w3cdtf">2023-08-29 15:36:22</recordChangeDate>
 <recordOrigin>machine generated</recordOrigin>
</recordInfo>
</modsCollection>