Electronic Theses and Dissertation
Universitas Syiah Kuala
SKRIPSI
PRARANCANGAN PABRIK NATRIUM SILIKAT DARI PASIR SILIKA DAN NATRIUM HIDROKSIDA DENGAN KAPASITAS PRODUKSI 50.000 TON/TAHUN
Pengarang
MUHAMMAD HARIS HIDAYAT - Personal Name;
Dosen Pembimbing
Umi Fathanah - 197404032000122001 - Dosen Pembimbing I
Sri Aprilia - 196704121993032001 - Dosen Pembimbing II
Nomor Pokok Mahasiswa
1804103010057
Fakultas & Prodi
Fakultas Teknik / Teknik Kimia (S1) / PDDIKTI : 24201
Subject
Kata Kunci
Penerbit
Banda Aceh : Fakultas Teknik Kimia., 2023
Bahasa
No Classification
-
Literature Searching Service
Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)
Prarancangan pabrik natrium silikat menggunakan pasir silika dan natrium hidroksida sebagai bahan baku utama. Proses produksi secara keseluruhan menggunakan proses brunner mond dengan konversi reaksi 90,3%. Kapasitas produksi sebesar 50.000 ton/tahun dengan waktu operasi 330 hari/tahun dan waktu 24 jam/hari. Pabrik ini direncanakan didirikan di Kabupaten Purwakarta, Provinsi Jawa Barat, Indonesia dengan luas area pabrik 24.780 m2. Bentuk perusahaan yang direncanakan adalah Perseroan Terbatas (PT) dengan menggunakan metode struktur organisasi garis dan staf (tenaga kerja sebanyak 140 orang). Kebutuhan air untuk pabrik berasal dari Sungai Citarum dengan laju alir 481.598,95 kg/jam, dan untuk kebutuhan listrik diperoleh dari generator dengan daya 1725,54 kW. Hasil analisis ekonomi diperoleh sebagai berikut:
1. Fixed Capital Investment (FCI) = Rp. 227.647.193.598
2. Working Capital Investment (WCI) = Rp. 56.911.798.400
3. Total Capital Investment (TCI) = Rp. 284.558.991.998
4. Total Production Cost (TPC) = Rp. 570.623.009.508
5. Sales Cost (SC) = Rp. 675.000.000.000
6. Pay Out Time (POT) = 2 tahun 6 bulan 6 hari
7. Break Event Point (BEP) = 48,2 %
8. Internal Rate of Return (IRR) = 23,32 %
Berdasarkan studi kelayakan teknis dan ekonomis diatas, maka dapat disimpulkan bahwa prarancangan pabrik natrium silikat ini layak untuk dilanjutkan ke tahap konstruksi
The sodium silicate plant design uses silica sand and sodium hydroxide as the main raw materials. The overall production process uses the brunner mond process with a reaction conversion of 90.3%. The production capacity is 50,000 tons/year with an operating time of 330 days/year and 24 hours/day. The plant is planned to be established in Purwakarta Regency, West Java Province, Indonesia with a plant area of 24,780 m2. The planned form of the company is a Limited Liability Company (PT) using the line and staff organizational structure method (workforce of 140 people). The water requirement for the plant comes from the Citarum River with a flow rate of 481,598.95 kg/hour, and the electricity requirement is obtained from a generator with a power of 1725.54 kW. The results of the economic analysis are as follows: 1. Fixed Capital Investment (FCI) = Rp. 227,647,193,598 2. Working Capital Investment (WCI) = Rp. 56,911,798,400 3. Total Capital Investment (TCI) = Rp. 284,558,991,998 4. Total Production Cost (TPC) = IDR. 570,623,009,508 5. Sales Cost (SC) = Rp. 675,000,000,000 6. Pay Out Time (POT) = 2 years 6 months 6 days 7. Break Event Point (BEP) = 48.2% 8. Internal Rate of Return (IRR) = 23.32 % Based on the technical and economic feasibility study above, it can be concluded that this sodium silicate plant is feasible to proceed to the construction stage.
PRARANCANGAN PABRIK NATRIUM SILIKAT DARI PASIR SILIKA DAN NATRIUM HIDROKSIDA MENGGUNAKAN PROSES BRUNNER MOND DENGAN KAPASITAS PRODUKSI 35.000 TON/TAHUN (Senja Angelita, 2019)
PRARANCANGAN PABRIK NATRIUM SILIKAT DARI PASIR SILIKA DAN NATRIUM HIDROKSIDA DENGAN KAPASITAS PRODUKSI 40.000 TON/TAHUN (AMMAR VIKO WICAKSONO, 2018)
PRARANCANGAN PABRIK NATRIUM SILIKAT DARI PASIR SILIKA DAN NATRIUM HIDROKSIDA DENGAN KAPASITAS PRODUKSI 50.000 TON/TAHUN (MUHAMMAD HARIS HIDAYAT, 2023)
PRARANCANGAN PABRIK NATRIUM SILIKAT DARI NATRIUM HIDROKSIDA DAN PASIR SILIKA DENGAN KAPASITAS PRODUKSI 50.000 TON/TAHUN (ALDI MUHAMMAD, 2023)
PRARANCANGAN PABRIK NATRIUM SILIKAT DARI NATRIUM HIDROKSIDA DAN PASIR SILIKA MENGGUNAKAN WET PROCESS DENGAN KAPASITAS PRODUKSI 35.000 TON/TAHUN (CUT NURUL ZAHRINA MARDIAN, 2022)