<?xml version="1.0" encoding="UTF-8" ?>
<modsCollection xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" xmlns:slims="http://slims.web.id" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd">
<mods version="3.3" id="113102">
 <titleInfo>
  <title></title>
 </titleInfo>
 <name type="Personal Name" authority="">
  <namePart>HERLINA ADRIYANTI</namePart>
  <role>
   <roleTerm type="text">Primary Author</roleTerm>
  </role>
 </name>
 <typeOfResource manuscript="no" collection="yes">mixed material</typeOfResource>
 <genre authority="marcgt">bibliography</genre>
 <originInfo>
  <place>
   <placeTerm type="text">Banda Aceh</placeTerm>
   <publisher>Fakultas Teknik Kimia</publisher>
   <dateIssued>2023</dateIssued>
  </place>
 </originInfo>
 <language>
  <languageTerm type="code">id</languageTerm>
  <languageTerm type="text">Indonesia</languageTerm>
 </language>
 <physicalDescription>
  <form authority="gmd">Skripsi</form>
  <extent></extent>
 </physicalDescription>
 <note>ABSTRAK&#13;
&#13;
Pra-rancangan pabrik iso-oktan ini menggunakan di-isobutilen dan hidrogen sebagai bahan baku utama. Kapasitas pabrik iso-oktan ini adalah 760.000 ton/tahun dengan hari kerja 330 hari/tahun. Bentuk perusahaan yang direncanakan adalah Perseroan Terbatas (PT) dengan menggunakan metode stuktur garis dan staf. Kebutuhan tenaga kerja untuk menjalankan perusahaan ini berjumlah 173 orang. Lokasi pabrik akan didirikan di Kecamatan Bontang Selatan, Kota Bontang, Provinsi Kalimantan Timur. Sumber air pabrik iso-oktan ini akan diambil dari Sungai Bontang dan untuk memenuhi kebutuhan listrik akan diperoleh dari Perusahaan Listrik Negara (PLN) dan generator berbahan bakar minyak solar.&#13;
Hasil analisa ekonomi yang diperoleh adalah sebagai berikut:&#13;
1.	Fixed Capital Investment (FCI)		= Rp.    1.010.592.525.825,37&#13;
2.	Working Capital Investment (WCI)	= Rp.    178.339.857.498,60&#13;
3.	Total Capital Investment (TCI)		= Rp.    1.188.932.383.323,96&#13;
4.	Total Production Cost (TPC)	        = Rp.	 259.459.657.468.607&#13;
5.	Sales Cost (SC)				= Rp. 	 2.768.346.489.428,40&#13;
6.	Laba Bersih				        = Rp.    510.826.284.246,19&#13;
7.	Pay Out Time (POT)			= 2,14 Tahun&#13;
8.	Break Event Point (BEP)		= 43,99%&#13;
9.	Internal Rate of Return (IRR)	= 33,26%&#13;
</note>
 <note type="statement of responsibility"></note>
 <subject authority="">
  <topic>HYDROGEN - CHEMISTRY</topic>
 </subject>
 <classification>546.2</classification>
 <identifier type="isbn"></identifier>
 <location>
  <physicalLocation>ELECTRONIC THESES AND DISSERTATION Universitas Syiah Kuala</physicalLocation>
  <shelfLocator></shelfLocator>
 </location>
 <slims:digitals/>
</mods>
<recordInfo>
 <recordIdentifier>113102</recordIdentifier>
 <recordCreationDate encoding="w3cdtf">2023-08-03 17:13:56</recordCreationDate>
 <recordChangeDate encoding="w3cdtf">2024-02-01 16:01:28</recordChangeDate>
 <recordOrigin>machine generated</recordOrigin>
</recordInfo>
</modsCollection>