IDENTIFICATION OF DOMINANT RISK FACTORS INFLUENCING CONSTRUCTION PROJECTS (STUDY ON THE SIGLI-BANDA ACEH TOLL ROAD PROJECT)


Pengarang

Mariama Badjie - Personal Name;

Dosen Pembimbing

Anita Rauzana - 198006202008122004 - Dosen Pembimbing I
Yusria Darma - 197301301999031002 - Dosen Pembimbing II



Nomor Pokok Mahasiswa

1904101010148

Fakultas & Prodi

Fakultas Teknik / Teknik Sipil (S1) / PDDIKTI : 22201

Penerbit

Banda Aceh : Fakultas Teknik., 2023

Bahasa

English

No Classification

625.7

Literature Searching Service

Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)

ABSTRAK

Proyek konstruksi melibatkan alokasi sumber daya tertentu yang bertujuan untuk mencapai hasil akhir pekerjaan, yang ditentukan oleh kesesuaian biaya, waktu, dan mutu. Manajemen risiko adalah praktik manajemen proyek utama yang memastikan bahwa risiko proyek dikendalikan. Risiko awal dapat diidentifikasi berdasarkan sumber ketidakpastiannya. Selain itu, saat ini risiko proyek terus meningkat, terbukti dengan meningkatnya pandemi yang terus menimbulkan risiko pembengkakan biaya, keterlambatan penyelesaian pekerjaan, dan ketidakakuratan kualitas. Tujuan dari penelitian ini adalah untuk mengidentifikasi faktor-faktor risiko utama yang mendorong pelaksanaan proyek pembangunan jalan dan untuk mengkaji kemungkinan dampak risiko yang muncul pada proyek tersebut. Proses tinjauan literatur digunakan untuk mencapai tujuan ini, dan makalah dari latar belakang akademis dan praktik industri disertakan. Menurut artikel yang dianalisis, berikut adalah variabel risiko utama yang mempengaruhi proyek konstruksi: pemasok yang tidak dapat memenuhi pesanan material; Biaya sewa peralatan tambahan; Akses alat berat sulit; Peningkatan biaya tenaga kerja; Metode konstruksi; Perubahan dalam perencanaan investigasi lapangan; dan Kondisi lokasi yang buruk dan sulit dijangkau. Makalah ini juga mengkaji teknik dan metode mitigasi risiko yang direkomendasikan. Metodologi campuran digunakan untuk penelitian ini, dengan literatur dan PT Hutama Karya sebagai sumber data. Uji validitas dan reliabilitas variabel penelitian, analisis deskriptif, skor rata-rata, dan standar deviasi menjadi prioritas utama dalam teknik analisis data. Saat tim proyek merencanakan, melaksanakan, dan memantau proyek mereka, makalah ini juga menawarkan analisis menyeluruh tentang strategi manajemen risiko terbaik. Akademisi, profesional, dan pemangku kepentingan yang terlibat dalam proyek konstruksi dalam konteks yang beragam mungkin menganggap kesimpulan dari pekerjaan ini sangat membantu.
Kata Kunci: Risiko, Faktor Dominan, Proyek Konstruksi, Pengaruh.

ABSTRACT Construction projects involve the allocation of certain resources that aim to achieve the final work result, which is determined by the suitability of cost, time, and quality. Risk management is a key project management practice that ensures that project risks are controlled. The initial risk can be identified based on the source of the uncertainty. In addition, nowadays project risks continue to increase, as evidenced by the increase in pandemics, which continue to create risks of cost overruns, delays in the completion of work, and inaccuracies in quality. The purpose of this study is to identify the key risk factors that drive road construction project implementation and to examine emerging risks' possible effects on the project. A literature review process was used to achieve this purpose, and papers from both the academic background and industrial practice were included. According to the articles analyzed, the following are the main risk variables that influence construction projects: suppliers who cannot fulfill the material ordered; Additional equipment rental fees; Difficult access for heavy equipment; Increased labor costs; Construction methods; Changes in planning field investigations; and Poor location conditions and being difficult to reach. The paper also examines the recommended risk mitigation techniques and methods. A mixed methodology was employed for the research, with literature and PT Hutama Karya as the data sources. Validity and reliability tests on the study variables, descriptive analysis, the mean score, and the standard deviation come first in the data analysis technique. As project teams plan, carry out, and monitor their projects, the paper also offers a thorough analysis of the best risk management strategies. Academics, professionals, and stakeholders who are involved in construction projects in diverse contexts might find the conclusions of this work to be helpful. Keywords: Risk, Dominant factors, Construction project, Influence. ABSTRACT Construction projects involve the allocation of certain resources that aim to achieve the final work result, which is determined by the suitability of cost, time, and quality. Risk management is a key project management practice that ensures that project risks are controlled. The initial risk can be identified based on the source of the uncertainty. In addition, nowadays project risks continue to increase, as evidenced by the increase in pandemics, which continue to create risks of cost overruns, delays in the completion of work, and inaccuracies in quality. The purpose of this study is to identify the key risk factors that drive road construction project implementation and to examine emerging risks' possible effects on the project. A literature review process was used to achieve this purpose, and papers from both the academic background and industrial practice were included. According to the articles analyzed, the following are the main risk variables that influence construction projects: suppliers who cannot fulfill the material ordered; Additional equipment rental fees; Difficult access for heavy equipment; Increased labor costs; Construction methods; Changes in planning field investigations; and Poor location conditions and being difficult to reach. The paper also examines the recommended risk mitigation techniques and methods. A mixed methodology was employed for the research, with literature and PT Hutama Karya as the data sources. Validity and reliability tests on the study variables, descriptive analysis, the mean score, and the standard deviation come first in the data analysis technique. As project teams plan, carry out, and monitor their projects, the paper also offers a thorough analysis of the best risk management strategies. Academics, professionals, and stakeholders who are involved in construction projects in diverse contexts might find the conclusions of this work to be helpful. Keywords: Risk, Dominant factors, Construction project, Influence.