PRARANCANGAN PABRIK PUPUK ZA (AMONIUM SULFAT) DENGAN KAPASITAS PRODUKSI 250.000 TON/TAHUN MENGGUNAKAN PROSES MERSEBURG | ELECTRONIC THESES AND DISSERTATION

Electronic Theses and Dissertation

Universitas Syiah Kuala

    SKRIPSI

PRARANCANGAN PABRIK PUPUK ZA (AMONIUM SULFAT) DENGAN KAPASITAS PRODUKSI 250.000 TON/TAHUN MENGGUNAKAN PROSES MERSEBURG


Pengarang

ANNISA ZERLINDA - Personal Name;

Dosen Pembimbing

Darmadi - 196603231993031003 - Dosen Pembimbing I
Adisalamun - 196705271993031003 - Dosen Pembimbing I



Nomor Pokok Mahasiswa

1904103010074

Fakultas & Prodi

Fakultas Teknik / Teknik Kimia (S1) / PDDIKTI : 24201

Subject
-
Kata Kunci
-
Penerbit

Banda Aceh : Fakultas Teknik (S1)., 2023

Bahasa

No Classification

-

Literature Searching Service

Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)

Prarancangan pabrik pupuk ZA (amonium sulfat) menggunakan bahan baku amonia, karbondioksida, dan gypsum yang ketiganya diperoleh dari PT. Petrokimia Gresik. Pabrik ini beroperasi selama 330 hari/tahun dengan kapasitas produksi 250.000 ton/tahun. Perseroan Terbatas (PT) adalah bentuk perusahaan yang direncanakan dengan menggunakan struktur garis dan staf. Kebutuhan tenaga kerja untuk menjalankan perusahaan ini berjumlah 93 orang. Lokasi pabrik direncanakan didirikan di Kelurahan Osowilangun, Kecamatan Benowo, Kota Surabaya, Jawa Timur dengan luas tanah 15.558 m2. Kebutuhan air untuk pabrik ini sebesar 93.030,10 kg/jam yang diperoleh dari sungai Lamong. Sumber listrik diperoleh dari Perusahaan Listrik Negara (PLN) dan generator dengan daya 716,01 kW.
Hasil analisa ekonomi yang diperoleh adalah sebagai berikut:
1. Fixed Capital Investment (FCI) = Rp. 1.167.871.726.418
2. Working Capital Investment (WCI) = Rp. 291.967.931.605
3. Total Capital Investment (TCI) = Rp. 1.459.839.658.023
4. Total Production Cost (TPC) = Rp. 1.275.235.539.238
5. Sales Cost (SC) = Rp. 1.832.089.600.330
6. Laba Bersih = Rp. 417.640.545.820
7. Pay Out Time (POT) = 4,35 tahun
8. Break Event Point (BEP) = 33%
9. Internal Rate of Return (IRR) = 24%
10. Rate of Return (ROR) = 28,61%

ZA fertilizer plant design (ammonium sulphate) uses ammonia, carbon dioxide and gypsum as raw materials, all three of which were obtained from PT. Petrokimia Gresik. This factory operates for 330 days/year with a production capacity of 250,000 tons/year. Limited Liability Company (PT) is a planned form of company using a line and staff structure. The workforce needed to run this company is 93 people. The factory location is planned to be built in Osowilangun Ward, Benowo District, Surabaya City, East Java with a land area of 15,558 m2. The water requirement for this factory is 93,030.10 kg/hour which is obtained from the Lamong river. The source of electricity is obtained from the State Electricity Company (PLN) and a generator with a power of 716.01 kW. The results of the economic analysis obtained are as follows: 1. Fixed Capital Investment (FCI) = Rp. 1.167.871.726.418 2. Working Capital Investment (WCI) = Rp. 291.967.931.605 3. Total Capital Investment (TCI) = Rp. 1.459.839.658.023 4. Total Production Cost (TPC) = Rp. 1.275.235.539.238 5. Sales Cost (SC) = Rp. 1.832.089.600.330 6. Laba Bersih = Rp. 417.640.545.820 7. Pay Out Time (POT) = 4,35 tahun 8. Break Event Point (BEP) = 33% 9. Internal Rate of Return (IRR) = 24% 10. Rate of Return (ROR) = 28,61%

Citation



    SERVICES DESK