PRARANCANGAN PABRIK ASETILENA DARI GAS ALAM DENGAN PROSES BASF (SACHSSE BARTHLOME) KAPASITAS PRODUKSI 3.000 TON/TAHUN | ELECTRONIC THESES AND DISSERTATION

Electronic Theses and Dissertation

Universitas Syiah Kuala

    SKRIPSI

PRARANCANGAN PABRIK ASETILENA DARI GAS ALAM DENGAN PROSES BASF (SACHSSE BARTHLOME) KAPASITAS PRODUKSI 3.000 TON/TAHUN


Pengarang

Sabrina Masthura - Personal Name;

Dosen Pembimbing

Farid Mulana - 197202081997021001 - Dosen Pembimbing I
Zuhra - 197403181999032001 - Dosen Pembimbing II



Nomor Pokok Mahasiswa

1804103010020

Fakultas & Prodi

Fakultas Teknik / Teknik Kimia (S1) / PDDIKTI : 24201

Subject
-
Kata Kunci
-
Penerbit

Banda Aceh : Prog. Studi Magister Teknik Kimia., 2023

Bahasa

No Classification

-

Literature Searching Service

Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)

Prarancangan pabrik asetilena menggunakan bahan baku gas alam dan oksigen dengan menggunakan proses BASF (Sachasse Barthlome). Kapasitas produksi direncanakan sebesar 3.000 ton/tahun dengan waktu operasi 330 hari/tahun. Bentuk perusahaan yang direncanakan adalah Perseroan Terbatas (PT) menggunakan metode struktur organisai garis dan staf. Tenaga kerja yang dibuthkan untuk menjalankan perusahaan ini berjumlah 90 orang. Direncanakan pabrik ini berdiri di Desa Blang Lancang, Kecamatan Muara Satu, Kota Lhokseumawe, Aceh dengan luas area 53.708 m2. Kebutuhan air untuk pabrik akan dipasok dari Sungai Peusangan Kabupaten Aceh Utara dengan total kebutuhan air 83,768,23 kg/jam. Sementara itu, untuk memenuhi kebutuhan listrik sebesar 1,24 Mw diperoleh dari Perusahaan Listrik Negara (PLN) dan generator diesel.
Hasil analisa ekonomi diperoleh sebagai berikut:

1. Fixed Capital Investment (FCI) = Rp 546.175.023.796,-
2. Working Capital Investment (WCI) = Rp 136.543.755.949,-
3. Total Capital Investment (TCI) = Rp 682.718.779.745,-
4. Total Production Cost (TPC) = Rp 1.032.467.806.954,-
5. Selling Cost (SC) = Rp 1.418.768.098.094,-
6. Laba Kotor = Rp 386.704.960.308,-
7. Laba Bersih = Rp 285.975.218.353,-
8. Pay Out Time = 3,60 tahun

The preliminary design of acetylene plant uses natural gas and oxygen as raw materials using the BASF (Sachasse Barthlome) process. The planned production capacity of this plant 3,000 tons/year with an operating time of 330 days/year. The form of this company is a Limited Liability Company (Ltd.) using the line and staff organizational structure type. The number of employees required to run this company is 90 people in total. This plant planned will be built in Blang Lancang Village, Muara Satu District, Lhokseumawe City, Aceh with an area of 53,708 m2. The water demand for the plant will be supplied from the Peusangan River, North Aceh Regency, with a total water demand of 83,768,23 kg/hour. Meanwhile, the electricity demand of 1.24 Mw obtained from the Perusahan Listrik Negara (PLN) and diesel generators. The result of economical anlysys of this plant are as follows: 1. Fixed Capital Investment (FCI) = Rp 546.175.023.796,65,- 2. Working Capital Investment (WCI) = Rp 136.543.755.949,16,- 3. Total Capital Investment (TCI) = Rp 682.718.779.745,81,- 4. Total Production Cost (TPC) = Rp 1.032.467.806.954,- 5. Selling Cost (SC) = Rp 1.418.768.098.094,- 6. Gross Profit = Rp 386.704.960.308,- 7. Net Income = Rp 285.975.218.353,- 8. Pay Out Time = 3,60 tahun