PRARANCANGAN PABRIK ASETON DARI DEHIDROGENASI ISOPROPANOL DENGAN KAPASITAS PRODUKSI 25.000 TON/TAHUN | ELECTRONIC THESES AND DISSERTATION

Electronic Theses and Dissertation

Universitas Syiah Kuala

    SKRIPSI

PRARANCANGAN PABRIK ASETON DARI DEHIDROGENASI ISOPROPANOL DENGAN KAPASITAS PRODUKSI 25.000 TON/TAHUN


Pengarang
Dosen Pembimbing

Mahidin - 197004031995121001 - Dosen Pembimbing I



Nomor Pokok Mahasiswa

1804103010011

Fakultas & Prodi

Fakultas Teknik / Teknik Kimia (S1) / PDDIKTI : 24201

Subject
-
Kata Kunci
-
Penerbit

Banda Aceh : Fakultas Teknik (S1)., 2023

Bahasa

No Classification

-

Literature Searching Service

Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)

Prarancangan pabrik Aseton ini menggunakan Isopropanol sebagai bahan baku.
Kapasitas produksi pabrik Aseton ini adalah 25.000 ton/tahun dengan hari kerja 330
hari/tahun. Bentuk perusahaan yang direncanakan adalah Perseroan Terbatas (PT) dengan
menggunakan metode struktur garis dan staf. Kebutuhan tenaga kerja untuk menjalankan
perusahaan ini berjumlah 150 orang. Lokasi pabrik direncanakan didirikan di Kecamatan
Mekarti Jaya, Kabupaten Banyuasin, Provinsi Sumatera Selatan dengan luas tanah 23.204
m2
. Sumber air pabrik Aseton ini berasal dari Sungai Musi dan untuk memenuhi
kebutuhan listrik diperoleh dari Perusahaan Listrik Negara (PLN) dan Generator dengan
daya 878,87 kW.
Hasil analisa ekonomi yang diperoleh adalah sebagai berikut:
10. Fixed Capital Investment = Rp 1.162.442.681.417,-
11. Working Capital Investment = Rp129.160.297.935,-
12. Total Capital Investment = Rp 1.291.602.979.352,-
13. Total Biaya Produksi = Rp 679.806.964.499,-
14. Hasil Penjualan = Rp 951.729.750.298,-
15. Laba bersih = Rp217.538.228.640,-
16. Pay Out Time (POT) = 3,77 year
17. Break even Point (BEP) = 40 %
18. Internal Rate of Rerurn = 28,64 %

This Acetone plant proposal uses Isopropanol as raw material. The production capacity of this Acetone plant is 25,000 tons/year with 330 working days/year. The planned company form is a Limited Liability Company (PT) using the line and staff structure method. The labor requirement to run this company is 150 people. The location of the plant is planned to be established in Mekarti Jaya District, Banyuasin Regency, South Sumatra Province with a land area of 23,204 m2. The water source of this Bioethanol plant comes from the Musi River and to meet the electricity needs obtained from the State Electricity Company (PLN) and Generators with a power of 878.87 kW. From economic analysis was obtained: 1. Fixed Capital Investment = Rp 1.162.442.681.417,- 2. Working Capital Investment = Rp129.160.297.935,- 3. Total Capital Investment = Rp 1.291.602.979.352,- 4. Total Biaya Produksi = Rp 679.806.964.499,- 5. Hasil Penjualan = Rp 951.729.750.298,- 6. Laba bersih = Rp217.538.228.640,- 7. Pay Out Time (POT) = 3,77 year 8. Break even Point (BEP) = 40 % 9. Internal Rate of Rerurn = 28,64 %

Citation



    SERVICES DESK