Electronic Theses and Dissertation
Universitas Syiah Kuala
LAPORAN KERJA PRAKTEK
SISTEM OPERASI PEMBANGKIT LISTRIK TENAGA DIESEL (ULPTD) LUENG BATA
Pengarang
Junrenal Tamsil - Personal Name;
Dosen Pembimbing
Suriadi - 197206061998021001 - Dosen Pembimbing I
Mahdi Syukri - 196812101998021001 - Penguji
Al Bahri - 199109102019031014 - Penguji
Nomor Pokok Mahasiswa
1904005010008
Fakultas & Prodi
Fakultas Teknik / Teknik Listrik (D3) / PDDIKTI : 20403
Subject
Penerbit
Banda Aceh : Fakultas Teknik (D3)., 2023
Bahasa
Indonesia
No Classification
621.312 1
Literature Searching Service
Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)
Listrik menjadi kebutuhan pokok pada era revolusi sekarang ini, penggunaan teknologi yang semakin canggih memberikan pengaruh yang sangat komplek akan kebutuhan terhadap tenaga listrik. Sistem pembangkit tenaga listrik dengan cara mengkonversi energi primer. Pembangkit Listrik Tenaga Diesel (PLTD) merupakan pembangkit listrik yang menggunakan mesin diesel sebagai penggerak mula (primer mover) yang menghasilkan energi mekanis yang diperlukan untuk mcmutar sebuah rotor generator unruk menghasilkan energi listrik. Tujuan penulisan ini untuk mengetahui Sistem Operasi pada Pembangkit Tenaga Diesel (PLTD) Lueng Bata, Kecamatan Lueng Bata Kota Banda Aceh. Jenis penelitian yang digunakan adalah penelitian survei pada metode deskriptif yang digunakan unruk melihat gambaran fenomena yang terjadi. Sumber data yang digunakan yaitu pada primer dan data sekunder yang diperoleh melalui observasi, wawancara dan dokumentasi. Berdasarkan basil penelitian menunjukkan bahwa unruk melak:ukan pengoperasian pada mesin diesel harus menerapkan SOP (Standar operasional prosedur) agar menghindari dari kecelakaan, pengoperasian generator pada PLTD Lueng Bata, Kecamatan Lueng Bata, Kota Banda Aceh menggunakan sistem operasi yang sesuai dengan SOP yang umumnya digunakan pada pembangkit dengan generator yang tidak bcroperasi untuk 24 jam dan memiliki kapasitas daya terpasang 58174 Mw dan daya mampu 28,4 Mw, supplay pegangan yang didistribusikan oleh PLTD Lueng Bata mencapai 20 KV dimana belum mencukupi kebutuhan daya dan tegangan di Kota Banda Aceh dan Aceh Besar, pengoperasian secara paralel dengan sumber PLN dilakukan jika terjadinya keadaan tidak normal atau terjadinya gangguan sehingga generator harus dioperasikan, dan pengoperasian generator yang dilakukan di PLTD Lueng Bata dilakukan pada kondisi jatuh tegangan (Drop) yaitu keadaan jatuh tegangan pada sistem dan jatuh tegangan pada beban puncak dan gangguan jaringan sistern, yaitu adanya jaringan kabel putus danj.aringan hubung singkat.
Kata Kunci : Sistem Operasional, Pcmbangkit Tenaga Disel (PLTD), Lueng Bata
Electricity is a basic need in the current revolutionary era, the use of increasingly sophisticated technology has a very complex influence on the need for electricity. Power generation system by converting primary energy. Diesel Power Plant (PLTD) is a power plant that uses a diesel engine as the primary mover which produces the mechanical energy needed to rotate a generator rotor to produce electrical energy. The purpose of this writing is to find out the Operating System for the Lueng Bata Diesel Power Plant (PLTD), Lueng Bata District, Banda Aceh City. The type of research used is survey research in the descriptive method used to see the description of the phenomena that occur. The data sources used are primary and secondary data obtained through observation, interviews and documentation. Based on the results of the study, it shows that to carry out operations on diesel engines, you must apply SOP (Standard operating procedures) in order to avoid accidents, the operation of generators at the Lueng Bata PLTD, Lueng Bata District, Banda Aceh City uses an operating system that is in accordance with the SOP that is generally used in a generator with a generator that does not operate for 24 hours and has an installed power capacity of 58174 Mw and a power capable of 28.4 Mw, the handle supply distributed by the Lueng Bata PLTD reaches 20 KV which is not sufficient for the power and voltage requirements in the City of Banda Aceh and Aceh Besar , operation in parallel with the PLN source is carried out if abnormal conditions or disturbances occur so that the generator must be operated, and generator operation is carried out at PLTD Lueng Bata carried out under conditions of voltage drop (Drop) namely the state of the voltage drop in the system and the voltage drop at peak load and network interference bro, the system, namely the existence of a broken cable network and a short circuit network. Keywords: Operational System, Diesel Power Plant (PLTD), Lueng Bata
OPTIMASI PENJADWALAN OPERASI PLTD PADA PT. PLN (PERSERO) SEKTOR NAGAN RAYA PUSAT LISTRIK LUENG BATA BANDA ACEH DENGAN MENGGUNAKAN METODE ITERASI LAMDA (dani novandi, 2016)
EVALUASI PERAWATAN INJECTOR UNTUK MENINGKATKAN DAYA MAMPU MESIN CCM SULZER PADA PT.PLN (PERSERO) SEKTOR NAGAN RAYA PUSAT LISTRIK LUENG BATA (Fazzery, 2024)
ANALISIS EFISIENSI PEMBANGKIT LISTRIK TENAGA DIESEL DI SEKTOR LUENG BATA (Ruri Nugrahani, 2023)
OPTIMASI PENJADWALAN OPERASI PEMBANGKIT LISTRIK TENAGA DIESEL DI CV. SARI ALAM DENGAN METODE PEMROGRAMAN DINAMIK (Fariz Ridha, 2024)
PENGUKURAN PERFORMANSI TURBIN ANGIN 10 KW PADA PEMBANGKIT LISTRIK HYBRID BAYU-DIESEL DI PIDIE JAYA (Fauzi, 2024)