PRARANCANGAN PABRIK SILIKON DIOKSIDA DARI NATRIUM SILIKAT DAN ASAM SULFAT DENGAN KAPASITAS PRODUKSI 25.000 TON/TAHUN | ELECTRONIC THESES AND DISSERTATION

Electronic Theses and Dissertation

Universitas Syiah Kuala

    SKRIPSI

PRARANCANGAN PABRIK SILIKON DIOKSIDA DARI NATRIUM SILIKAT DAN ASAM SULFAT DENGAN KAPASITAS PRODUKSI 25.000 TON/TAHUN


Pengarang

END REDY JANNAH MANGKAY - Personal Name;

Dosen Pembimbing

M. Faisal - 197309061998021001 - Dosen Pembimbing I
Farid Mulana - 197202081997021001 - Dosen Pembimbing II



Nomor Pokok Mahasiswa

1704103010052

Fakultas & Prodi

Fakultas Teknik / Teknik Kimia (S1) / PDDIKTI : 24201

Subject
-
Kata Kunci
-
Penerbit

Banda Aceh : Fakultas Teknik Kimia., 2022

Bahasa

No Classification

-

Literature Searching Service

Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)

Prarancangan pabrik silikon dioksida ini menggunakan natrium silikat dan asam sulfat sebagai bahan baku. Kapasitas produksi pabrik silikon dioksida ini adalah 25.000 ton/tahun dengan hari kerja yaitu 330 hari/tahun, Proses pembuatan bioetanol terdiri dari tiga tahapan yaitu persiapan bahan baku, sintesa silikon dioksida dan tahapan pemurnian. Bentuk perusahaan yang direncanakan adalah Perseroan Terbatas (PT) dengan menggunakan metode struktur garis dan staf. Kebutuhan tenaga kerja untuk menjalankan perusahaan ini berjumlah 163 orang. Pabrik Bioetanol ini direncakan berlokasi di JIIPE (Java Integrated Industrial and Port Estate), Kabupaten Gresik, Provinsi JawaTimur dengan luas tanah 31.800 m2. Sumber air pabrik silikon dioksida berasal dari Sungai Manyar, Provinsi Jawa Timur dan untuk memenuhi kebutuhan listrik diperoleh dari Perusahaan Listrik Negara (PLN) dan generator dengan daya 2118,84 kW
Hasil analisa ekonomi yang diperoleh sebagai berikut:
a. Fixed Capital Investment (FCI) = Rp 216.867.822.111,-
b. Working Capital Investment (WCI) = Rp 24.096.424.679,-
c. Total Capital Investment (TCI) = Rp 240.964.246.790,-
d. Total biaya produksi (TPC) = Rp 427.703.406.145,-
e. Hasil penjualan (SC) = Rp 540.235.344.144,-
f. Laba bersih = Rp 81.866.984.894,-
g. Pay Out Time (POT) = 4,2 tahun
h. Break Event Point (BEP) = 40,1 %
i. Internal Rate of Return (IRR) = 25,83 %
j. Rate of Return (ROR) = 32,95 %

This preliminary of silicon dioxide factory design use sodium silicate and sulphuric acid as a raw material with the production capacity is 25.000 ton/year with work day about 330 days of a year. The process to produce silicon dioxide consists of three stages, there are preparation of raw materials, synthesis of silicon dioxide and the purification stage. The planned form of company is a Limited Liability Company (Ltd). The factory plant is planned to be established in JIIPE (Java Integrated Industrial and Port Estate), Gresik Regency, East Java Province. The workers needed to run this company amounted to 163 people. The area of land required to set up the factory is 31,800 m2. The water source of the silicon dioxide plant comes from the Manyar river, East Java Province and the electricity need is obtained from the State Electricity Company (PLN) and the Generator of 2118,84 kW. The results of economic analysis are below: a. Fixed Capital Investment (FCI) = Rp 216.867.822.111,- b. Working Capital Investment (WCI) = Rp 24.096.424.679,- c. Total Capital Investment (TCI) = Rp 240.964.246.790,- d. Total biaya produksi (TPC) = Rp 427.703.406.145,- e. Sales Cost (SC) = Rp 540.235.344.144,- f. Net Profit = Rp 81.866.984.894,- g. Pay Out Time (POT) = 4,2 tahun h. Break Event Point (BEP) = 40,1 % i. Internal Rate of Return (IRR) = 25,83 % j. Rate of Return (ROR) = 32,95 %