Electronic Theses and Dissertation
Universitas Syiah Kuala
SKRIPSI
PRARANCANGAN PABRIK HEXAMINE DARI FORMALDEHIDA DAN AMMONIA DENGAN PROSES ALEXANDER F. MACLEAN DENGAN KAPASITAS PRODUKSI 12.000 TON/TAHUN
Pengarang
Widia Puspita Sari - Personal Name;
Dosen Pembimbing
Nasrul - 197210202000121001 - Dosen Pembimbing I
Sri Mulyati - 197302272000122001 - Dosen Pembimbing II
Nomor Pokok Mahasiswa
1804103010005
Fakultas & Prodi
Fakultas Teknik / Teknik Kimia (S1) / PDDIKTI : 24201
Subject
Kata Kunci
Penerbit
Banda Aceh : Fakultas Teknik Kimia., 2022
Bahasa
No Classification
-
Literature Searching Service
Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)
Prarancangan pabrik Hexamine ini menggunakan bahan baku ammonia dan formaldehida. Ammonia diperoleh dari PT. Pupuk Sriwijaya Palembang, sementara itu diperoleh dari PT. Intan Wijaya Internasional Tbk. Kapasitas produksi pabrik ini adalah 12.000 ton/tahun dengan hari kerja 330 hari/tahun. Bentuk perusahaan yang direncanakan adalah Perseroan Terbatas (PT) dengan menggunakan metode struktur garis dan staf. Kebutuhan tenaga kerja untuk menjalankan perusahaan ini berjumlah 137 orang. Rencana pendirian pabrik di Jl. Intan, Sei Selincah, Kalidoni, Kota Palembang, Sumatera Selatan, 30119 dengan luas area 40.000 m2. Sumber air pabrik ini berasal dari Sungai Musi, Kota Palembang, Sumatera Selatan dengan total kebutuhan air sebesar 90.253,2123 kg/jam, serta untuk memenuhi kebutuhan listrik sebesar 1.038 kW/hari diperoleh dari listrik PLN dan sebagai cadangan digunakan juga generator diesel.
The Hexamine plant design uses ammonia and formaldehyde raw materials. Ammonia was obtained from PT. Pupuk Sriwijaya Palembang, meanwhile, was obtained from PT. Intan Wijaya Internasional Tbk. The factory's production capacity is 12,000 tons/year with a working day of 330 days/year. The planned company form is a Limited Liability Company (PT) using the line and staff structure method. The workforce needed to run this company is 137 people. The plan to establish a factory on Jl. Intan, Sei Selincah, Kalidoni, Palembang City, South Sumatra, 30119 with an area of 40,000 m2. The water source for this factory comes from the Musi River, Palembang City, South Sumatra with a total water requirement of 90,253.2123 kg/hour, and to meet the electricity demand of 1,038 kW/day obtained from PLN electricity and a diesel generator is also used as a backup.
PRARANCANGAN PABRIK HEXAMETHYLENE TETRAMINE MENGGUNAKAN PROSES WOOD DAN STEVEN DENGAN KAPASITAS PRODUKSI 15.000 TON/TAHUN (M. PRAYOGIE AULIA, 2021)
PRARANCANGAN PABRIK RESIN FENOL FORMALDEHID DENGAN KAPASITAS 19.000 TON/TAHUN (GEUBRINA RISKY FAJRIA, 2021)
PRARANCANGAN PABRIK RESIN FENOL FORMALDEHID DENGAN KAPASITAS PRODUKSI 19.000 TON/TAHUN (ELZA YUNI AFRI, 2021)
PRARANCANGAN PABRIK HEXAMETHYLENE TETRAMINE MENGGUNAKAN PROSES WOOD DAN STEVEN DENGAN KAPASITAS PRODUKSI 15.000 TON/TAHUN (REZA RIZKI, 2021)
PRARANCANGAN PABRIK GLISEROL DARI MINYAK JARAK DENGAN KAPASITAS PRODUKSI 16.000 TON/TAHUN (ERNA ANDAU, 2021)