Electronic Theses and Dissertation
Universitas Syiah Kuala
SKRIPSI
PENGONTROLAN DAYA SISTEM INSTALASI LISTRIK HIBRID PLTS ON-GRID RUMAH TINGGAL BERBASIS NODEMCU
Pengarang
IRFAN MAULANA S - Personal Name;
Dosen Pembimbing
Ira Devi Sara - 197705252001122001 - Dosen Pembimbing I
Mansur Gapy - 195810041986031001 - Dosen Pembimbing II
Fathurrahman - 198701052019031009 - Penguji
Ardiansyah - 197212261992011001 - Penguji
Rakhmad Syafutra Lubis - 196901051999031001 - Penguji
Nomor Pokok Mahasiswa
1804105010072
Fakultas & Prodi
Fakultas Teknik / Teknik Elektro (S1) / PDDIKTI : 20201
Subject
Kata Kunci
Penerbit
Banda Aceh : Fakultas Teknik (S1)., 2022
Bahasa
No Classification
-
Literature Searching Service
Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)
Pada penelitian ini pembangkit sistem hibrid yang digunakan yaitu Pembangkit Listrik Tenaga Surya (PLTS) dan Perusahaan Listrik Negara (PLN). Sistem hibrid PLTS-PLN akan diaplikasikan pada instalasi rumah tinggal dengan menggunakan sistem switching. Pada penelitian ini perangkat sistem hibrid memiliki 2 skema kerja yaitu PLTS dan PLN menyuplai daya secara bersamaan (On-Grid) dan PLTS bekerja secara independen (Off-Grid). Pengontrolan daya pada perangkat dilakukan oleh relai MK2P 220 V AC, dimana konfigurasi On-Grid terhubung dengan kontak relai bertipe normally open (NO) dan konfigurasi Off-Grid terhubung dengan kontak relai bertipe normally close (NC). Sehingga konfigurasi On-Grid akan dijalankan pada saat daya PLN dalam kondisi normal dan konfigurasi Off-Grid akan dijalankan pada saat PLN mengalami pemadaman. Perangkat sistem hibrid yang dihasilkan dapat mengatur suplai beban sesuai dengan perancangan, dimana sistem switching dapat dilakukan secara otomatis. Selain itu juga terdapat sebuah saklar untuk menggantikan jenis pengontrolan menjadi secara manual untuk kondisi Emergency dan akan menggunakan selector switch sebagai pemilih keputusan untuk jenis konfigurasi yang akan dijalankan.
Kata Kunci: Hibrid, Monitoring, NodeMCU, Off-Grid, On-Grid.
In this study, the hybrid system generator used is the Solar Power Plant (PLTS) and the State Electricity Company (PLN). The PLTS-PLN hybrid system will be applied to residential installations using a switching system. In this study, the hybrid system device has 2 work schemes, that is PLTS and PLN supplying power simultaneously (On-Grid) and PLTS works independently (Off-Grid). The power control on the device is carried out by the MK2P 220 V AC relay, where the On-Grid configuration is connected to the NO type relay contact and the Off-Grid configuration is connected to the NC type relay contact. So that the On-Grid configuration will run when the PLN power is in normal conditions and the Off-Grid configuration will run when the PLN has a blackout. The resulting hybrid system device can adjust the load supply according to the design, where the switching system can be done automatically. In addition, there is also a switch to replace the type of control to be manual for Emergency conditions and will use a switch selector as a decision selector for the type of configuration to be executed. Keywords: Hibrid, monitoring, nodeMCU, Off-Grid, On-Grid.
DESAIN FILTER DAYA AKTIF UNTUK MITIGASI HARMONIK PADA PEMBANGKIT LISTRIK TENAGA SURYA ON GRID (Muhammad Afdal, 2023)
PENGARUH PENGGUNAAN BATERAI TERHADAP KONTINUITAS SUPLAI DAYA SISTEM HIBRID PLTS DAN PLN (Fadilah Agung Amrizal, 2023)
INSTALASI PENERANGAN PADA RUMAH SAKIT PRINCE NAYEF BIN ABDUL AZIZ UNSYIAH DESIGN OF LIGHTING INSTALLATION AT PRINCE NAYEF BIN ABDUL AZIZ UNSYIAH HOSPITAL (Shela Monika, 2017)
PROSEDUR PEMOTONGAN PPH PASAL 23 ATAS JASA INSTALASI LISTRIK RUMAH KAUM DHUAFA PADA DINAS ENERGI DAN SUMBER DAYA MINERAL ACEH (LIA ROLISA, 2017)
SIMULASI SISTEM HIBRID PEMBANGKIT ENERGI SURYA, ANGIN DAN GENERATOR UNTUK MENGOPTIMALKAN PEMANFAATAN DAYA ENERGI TERBARUKAN (Hendrayana, 2016)