Electronic Theses and Dissertation
Universitas Syiah Kuala
KARYA KERJA ILMIAH
EVALUASI HARGA PADA PEKERJAAN STRUKTURALRNPEMBANGUNAN RUANG KELAS BARU MIN 13RNPIDIE JAYA
Pengarang
RIZKI MUHAMMAD SAPUTRA - Personal Name;
Dosen Pembimbing
Nurisra - 197010011997022001 - Dosen Pembimbing I
Nomor Pokok Mahasiswa
1704001010067
Fakultas & Prodi
Fakultas Teknik / Teknik Sipil (D3) / PDDIKTI : 22401
Subject
Kata Kunci
Penerbit
Banda Aceh : Fakultas Teknik (D3)., 2022
Bahasa
No Classification
-
Literature Searching Service
Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)
Proyek Pembangunan Ruang Kelas Baru Min 13 Pidie Jaya bertujuan untuk
meningkatkan sarana dan prasarana dalammenunjang kegiatan belajar mengajar di
sekolah. Pada tugas akhir ini mengevaluasi tentang perbandingan biaya yang di
hitung oleh kontraktor dengan hasil berdasarkan harga pasar tahun 2022 di Desa
Leung Putu, Kecamatan Bandar Baru, Kabupaten Pidie Jaya. Pembangunan
Ruang Kelas Baru Min 13 Pidie Jaya, terletak di Gampong Ulee Gle, Kecamatan
Bandar Dua, Kabupaten Pidie Jaya. Objek bangunan merupakan gedung yang
terdiri dari 2 lantai dengan CV. Star Project sebagai pelaksana. Dana untuk
pelaksanaan sebesar Rp.2.639.150.000,- (Dua Milyar Enam Ratus Tiga Puluh
Sembilan Juta Seratus Lima Puluh Ribu Rupiah). Hasil perencanaan memberikan
informasi perbandingan biaya dalambentuk histogram untuk mengetahui seberapa
besar selisih biaya dari setiap pekerjaan yang dihitung. Perhitungan analisa harga
satuan pekerja menggunakan AHSP 2016. Hasil harga total untuk pekerjaan
struktur lantai 1 dan lantai 2 Pembangunan Ruang Kelas Baru Min 13 Pidie Jaya
tahun 2021 berdasarkan hasil kontraktor sebesar Rp 878.550.000 sedangkan
berdasarkan hasil survei harga pasar tahun 2022 sebesar Rp 918.624.000 jika di
bandingkanselisih harga tersebut senilai Rp 40.074.000.
Kata Kunci : Perbandingan Harga, Pekerjaan Struktural,
Pidie Jaya's Min 13 New Classroom Development Project aims to: improve facilities and infrastructure to support teaching and learning activities in school. In this final project evaluate the comparison of costs calculated by the contractor with the results based on the 2022 market price in the Village Leung Putu, Bandar Baru District, Pidie Jaya Regency. Development New Classroom Min 13 Pidie Jaya, located in Ulee Gle Village, Kecamatan Bandar Dua, Pidie Jaya Regency. The building object is a building that consists of 2 floors with CV. Star Project as executor. Funds for implementation of Rp.2,639,150,000, - (Two Billion Six Hundred Thirty Nine Million One Hundred Fifty Thousand Rupiah). Planning results provide cost comparison information in the form of a histogram to find out how much the difference in the cost of each calculated job. Price analysis calculation labor unit using AHSP 2016. Result of total price for work 1st and 2nd floor structure Construction of New Classroom Min 13 Pidie Jaya 2021 based on the contractor's results of Rp. 878,550,000 while based on the results of the market price survey in 2022 of Rp 918,624,000 if compare the price difference of Rp 40,074,000. Keywords: Price Comparison, Structural Work,
PERENCANAAN KEBUTUHAN DAN BIAYARNMATERIAL PADA PROYEK PEMBANGUNANRNGEDUNG/RUANG BARU PUSKESMAS KUALA BA’URNKABUPATEN ACEH SELATAN (TEUKU VISHAL IRDAHAS, 2022)
PENANGANAN LONG SEGMENT PEMELIHARAAN BERKALA PENINGKATAN REKONSTRUKSI JALAN LEUPE – LHUET – MUKHAN KECAMATAN JAYA KABUPATEN ACEH JAYA (NAUFAL MUTAWAKKIL, 2025)
PERBANDINGAN PRESTASI BELAJAR SISWA KELAS VII DENGAN MENGGUNAKAN MODEL PEMBELAJARAN KOOPERATIF TIPE PICTURE AND PICTURE PADA MATERI APRESIASI TARI TRADISIONAL DAERAH SETEMPAT DI SMPN 5 BANDAR BARU KABUPATEN PIDIE JAYA (Isnaniah, 2014)
ESTIMASI BIAYA PEKERJAAN NON STRUKTURAL PADA BANGUNAN GEDUNG SEKOLAH (MUHAMMAD RIZKI, 2020)
PENERAPAN PEMBELAJARAN KOOPERATIF TIPE PICTURE AND PICTURE DALAM PEMBELAJARAN IPS SISWA KELAS VIII10 SMP NEGERI 1 BANDAR BARU PIDIE JAYA (Nurmala, 2013)