Electronic Theses and Dissertation
Universitas Syiah Kuala
SKRIPSI
IDENTIFIKASI FAKTOR-FAKTOR RISIKO TAHAP PERENCANAAN PEMBANGUNAN IRIGASI BERBASIS MASYARAKAT
Pengarang
INDAH KURNIAWATI - Personal Name;
Dosen Pembimbing
Nomor Pokok Mahasiswa
1704101010007
Fakultas & Prodi
Fakultas Teknik / Teknik Sipil (S1) / PDDIKTI : 22201
Subject
Kata Kunci
Penerbit
Banda Aceh : Fak. Teknik Sipil., 2022
Bahasa
No Classification
-
Literature Searching Service
Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)
Infrastruktur perdesaan merupakan suatu infrastruktur yang bersifat fisik yang memberikan akses untuk pelayanan dasar, sosial sekaligus ekonomi untuk masyarakat desa. Salah satu program pembangunan irigasi yang berbasis masyarakat pada hal ini yaitu Program Percepatan Peningkatan Tata Guna Air Irigasi (P3-TGAI) terdapat di Kabupaten Aceh Besar. Setiap proyek pembangunan yang sedang berlansung akan menimbulkan risiko ketidakpastian dalam kelancaran perencanaan proyek tersebut. Risiko yang terjadi dalam proyek bisa di timbulkan dari beberapa sumber, namun dalam hal ini risiko yang di kaji berfokus pada tahap perencanaan agar sesuai dengan biaya, mutu serta waktu perencanaan sesuai rencana awal pembangunan. Sumber data yang didapat berasal dari data primer yaitu dengan cara menyebarkan hasil kuisioner kepada 25 responden yang memiliki jabatan sebagai Konsultan Manajemen Balai (KMB) dan Tim Pendamping Masyarakat (TPM), kemudian data sekunder didapat dari beberapa penelitian terdahulu seperti jurnal. Maka penelitian ini dilakukan bertujuan untuk mengidentifikasi faktor risiko yang ada pada tahap perencanaan pembangunan irigasi berbasis masyarakat di Kabupaten Aceh Besar, untuk dapat mengetahui risiko yang dominan mempengaruhi jalanya proyek melalui pengujian instrument yaitu uji validalitas dan reliabilitas. Selanjutnya akan dilakukan analisis frequency index (FI), severity index (SI), probability impact matrix (PIM) untuk proses pengolahan data. Hasil penelitian teridentifikasi 21 faktor risiko dari yang tertinggi sampai yang terendah. Dari 21 faktor risiko didapat faktor risiko dominan pada peristiwa terlalu banyak pihak yang terlibat (pihak ketiga/tokoh masyarakat) terhadap biaya, faktor dominan terhadap mutu terdapat diperistiwa Permasalahan ketersediaan lahan (petani tidak mau lahannya digunakan), sedangkan faktor dominan terhadap waktu terdapat diperistiwa kurangnya pengetahuan masyarakat tentang spesifikasi.
Rural infrastructure is a physical infrastructure that provides access to basic, social and economic services for rural communities. One of the community-based irrigation development programs in this regard, namely the Program for the Acceleration of Improved Irrigation Water Use (P3-TGAI) is located in Aceh Besar District. Any ongoing development project will pose a risk of uncertainty in the smooth planning of the project. The risks that occur in the project can be generated from several sources, but in this case the risks studied focus on the planning stage to match the costs, quality and planning time according to the initial development plan. The source of the data obtained comes from primary data, namely by distributing the results of questionnaires to 25 respondents who have positions as Center Management Consultants (KMB) and Community Assistance Teams (TPM), then secondary data is obtained from several previous studies such as journals. So this study was conducted aiming to identify the risk factors that exist at the planning stage of community-based irrigation development in Aceh Besar District, to be able to find out the dominant risks affecting the project's net through instrument testing, namely validity and reliability tests. Furthermore, analysis of frequency index (FI), severity index (SI), probability impact matrix (PIM) will be carried out for data processing. The results of the study identified 21 risk factors from the highest to the lowest. Of the 21 risk factors, the dominant risk factor was found in the event that there were too many parties involved (third parties/community leaders) with respect to costs, the dominant factor on quality was in the incident. Problems with land availability (farmers do not want their land to be used),while the dominant factor against time is the lack of public knowledge about specifications.
ANALISIS RISIKO PADA TAHAPAN PERSIAPAN PROYEK PEMBANGUNAN IRIGASI BERBASIS MASYARAKAT (CUT FAHRINA, 2022)
IDENTIFIKASI FAKTOR-FAKTOR RISIKO TAHAP PERENCANAAN PEMBANGUNAN IRIGASI BERBASIS MASYARAKAT (INDAH KURNIAWATI, 2022)
PARTISIPASI MASYARAKAT DALAM PROSES PERENCANAAN PEMBANGUNAN DESA DI GAMPONG BARABUNG KECAMATAN DARUSSALAM KABUPATEN ACEH BESAR (Marlita, 2018)
FAKTOR-FAKTOR RISIKO YANG MEMPENGARUHI KINERJA TAHAP PELAKSANAAN PROYEK IRIGASI PROVINSI ACEH (Nizamuddin, 2025)
INTEGRASI DATA PERENCANAAN PEMBANGUNAN DAERAH ANTAR KABUPATEN/KOTA DI PROVINSI NAD BERBASIS WEB (Fachrul Fikri, 2024)