PRARANCANGAN PABRIK DIMETIL ETER (DME) MELALUI DIRECT SYNTHESIS PROCESS DENGAN KAPASITAS PRODUKSI 200.000 TON/TAHUN | ELECTRONIC THESES AND DISSERTATION

Electronic Theses and Dissertation

Universitas Syiah Kuala

    SKRIPSI

PRARANCANGAN PABRIK DIMETIL ETER (DME) MELALUI DIRECT SYNTHESIS PROCESS DENGAN KAPASITAS PRODUKSI 200.000 TON/TAHUN


Pengarang

MUHAMMAD ALFATH - Personal Name;

Dosen Pembimbing

Yanna Syamsuddin - 196901131998022001 - Dosen Pembimbing I



Nomor Pokok Mahasiswa

1704103010047

Fakultas & Prodi

Fakultas Teknik / Teknik Kimia (S1) / PDDIKTI : 24201

Penerbit

Banda Aceh : Fakultas Teknik., 2022

Bahasa

Indonesia

No Classification

660

Literature Searching Service

Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)

Prarancangan pabrik dimetil eter (DME) ini menggunakan metode direct synthesis process dengan bahan baku batubara. Batubara diperoleh dari PT. Kaltim Prima Coal. Kapasitas produksi pabrik ini adalah 200.000 Ton/Tahun dengan hari kerja 330 hari/tahun. Bentuk perusahaan yang direncanakan adalah Perseroan Terbatas (PT) dengan menggunakan metode struktur garis dan staf. Kebutuhan tenaga kerja untuk menjalankan perusahaan ini berjumlah 227 orang. Lokasi pabrik direncanakan didirikan di Desa Kariangau, Kecamatan Balikpapan Barat, Kota Balikpapan, Kalimantan Timur, dengan luas tanah 63.135 m2. Sumber air pabrik ini berasal dari Sungai Wain, Kota Balikpapan dengan total kebutuhan air sebesar 1.123.348,88 kg/jam, serta untuk memenuhi kebutuhan listrik sebesar 7 MW diperoleh dari generator diesel.

Hasil analisa ekonomi yang diperoleh adalah sebagai berikut :
1. Fixed Capital Investment (FCI) = Rp. 1.887.771.658.387,-
2. Working Capital Investment (WCI) = Rp. 209.752.406.487,-
3. Total Capital Investment (TCI) = Rp. 2.097.524.064.875,-
4. Total Production Cost (TPC) = Rp. 1.420.362.572.409,
5. Sales Cost (SC) = Rp. 1.947.094.649.661,-
6. Laba bersih = Rp. 395.049.057.939,-
7. Pay Out Time (POT) = 5 tahun
8. Rate of Return (ROR) = 18,83%
9. Break Event Point (BEP) = 38%
10. Net Present Value (NPV) = Rp. 76.230.127.260,-

The preliminary design of dimethyl ether (DME) plant provided is using direct synthesis method with coal as a raw material. Coal is obtained from PT. Kaltim Prima Coal. The production capacity of this plant is 200.000 ton/year with work days of 330 days/year. The form of this company is Limited Liability Company (Ltd) and using structur of line and staff method, with total of manpower 227 people. The factory location was planned in Kariangau, West Balikpapan Regency, Balikpapan City, East Kalimantan with area of 63.135 m2. Water demand of this factory is supplied from Wain River in Balikpapan City with total water demand of 1.123.348,88 kg/hour, and electricity demand is fully supplied by diesel generator with power of 7 MW. From economic analysis was obtained: 1. Fixed Capital Investment (FCI) = Rp. 1.887.771.658.387,- 2. Working Capital Investment (WCI) = Rp. 209.752.406.487,- 3. Total Capital Investment (TCI) = Rp. 2.097.524.064.875,- 4. Total Production Cost (TPC) = Rp. 1.420.362.572.409, 5. Sales Cost (SC) = Rp. 1.947.094.649.661,- 6. Net profit = Rp. 395.049.057.939,- 7. Pay Out Time (POT) = 5 years 8. Rate of Return (ROR) = 18,83% 9. Break Event Point (BEP) = 38% 10. Net Present Value (NPV) = Rp. 76.230.127.260,-

Citation



    SERVICES DESK