PRARANCANGAN PABRIK PAPAN PARTIKEL DARI TANDAN KOSONG KELAPA SAWIT DAN POLYESTER DENGAN KAPASITAS PRODUKSI 125.000 TON/TAHUN | ELECTRONIC THESES AND DISSERTATION

Electronic Theses and Dissertation

Universitas Syiah Kuala

    SKRIPSI

PRARANCANGAN PABRIK PAPAN PARTIKEL DARI TANDAN KOSONG KELAPA SAWIT DAN POLYESTER DENGAN KAPASITAS PRODUKSI 125.000 TON/TAHUN


Pengarang

MUHAMAD TAUFIK - Personal Name;

Dosen Pembimbing

Syaubari - 196508041992031002 - Dosen Pembimbing I
Mirna Rahmah Lubis - 197710012003122001 - Dosen Pembimbing II



Nomor Pokok Mahasiswa

1704103010015

Fakultas & Prodi

Fakultas Teknik / Teknik Kimia (S1) / PDDIKTI : 24201

Subject
-
Kata Kunci
-
Penerbit

Banda Aceh : Fakultas Teknik., 2022

Bahasa

No Classification

-

Literature Searching Service

Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)

Prarancangan pabrik Papan Partikel ini menggunakan bahan baku tandan kosong kelapa sawit dan Polyester. Kapasitas produksi pabrik ini adalah 125.000 Ton/Tahun dengan hari kerja 330 hari/tahun. Pabrik ini direncanakan didirikan di
Desa Lingkuang Aua, Kecamatan Pasaman, Kabupaten Pasaman Barat, Sumatera Barat dengan luas tanah 21.130 m2. Bentuk perusahaan yang direncanakan adalah Perseroan Terbatas (PT) dengan menggunakan metode struktur organisasi garis dan staf (tenaga kerja sebanyak 124 orang). Sumber air pabrik ini berasal dari Sungai Batang Pasaman, Kecamatan Pasaman, Kabupaten Pasaman Barat dengan total kebutuhan air sebesar 74.664,631 kg/jam, dan untuk kebutuhan listrik diperoleh dari Perusahaan Listrik Negara (PLN) dan generator dengan daya 1.300,217 kW.
Hasil analisa ekonomi yang diperoleh adalah sebagai berikut:
1. Fixed Capital Investment (FCI) = Rp. 391.934.160.027,-
2. Working Capital Investment (WCI) = Rp. 69.164.851.769,-
3. Total Capital Investment (TCI) = Rp. 461.099.011.796,-
4. Total Production Cost (TPC) = Rp. 924.921.028.572,-
5. Sales Cost (SC) = Rp. 1.094.020.620.966,-
6. Laba Bersih = Rp. 126.824.694.295,-
7. Pay Out Time (POT) = 4,76 tahun
8. Break Event Point (BEP) = 40,98%
9. Internal Rate of Return (IRR) = 22,03%
10. Rate Of Return (ROR) = 28%

Particle Board plant design uses oil palm empty fruit bunches and Polyester as raw materials. The production capacity of this factory is 125.000 tons/year with 330 working days/year. The location of the factory is planned to be established in Lingkuang Aua Village, Pasaman District, West Pasaman Regency, West Sumatra with a land area of 21.130 m2. The planned form of this company is an Incorporated (Inc.) using the line and staff structure method (a workforce of 124 people). The water source for this factory comes from the Batang Pasaman River, Pasaman District, West Pasaman Regency with a total water needed is 74.664,631kg/hour, and for electricity needs it is obtained from the State Electricity Company (PLN) and a generator with a power of 1.300,217 kW.The result of the economic analysis obtained are as follows: 1. Fixed Capital Investment = Rp. 391.934.160.027,- 2. Working Capital Investment = Rp. 69.164.851.769,- 3. Total Capital Investment = Rp. 461.099.011.796,- 4. Total Production Cost = Rp. 924.921.028.572,- 5. Sales Cost = Rp. 1.094.020.620.966,- 6. Net Profit = Rp. 126.824.694.295,- 7. Pay Out Time = 4,76 years 8. Break Event Point = 40,98% 9. Internal Rate of Return = 22,03% 10. Rate Of Return = 28%