SKRIPSI
PRARANCANGAN PABRIK PAPAN PARTIKEL DARI TANDAN KOSONG KELAPA SAWIT DAN POLYESTER DENGAN KAPASITAS PRODUKSI 125.000 TON/TAHUN
Pengarang
MUHAMAD TAUFIK - Personal Name;
Dosen Pembimbing
Syaubari - 196508041992031002 - Dosen Pembimbing I
Mirna Rahmah Lubis - 197710012003122001 - Dosen Pembimbing II
Nomor Pokok Mahasiswa
1704103010015
Fakultas & Prodi
Fakultas Teknik / Teknik Kimia (S1) / PDDIKTI : 24201
Subject
Kata Kunci
Penerbit
Banda Aceh : Fakultas Teknik., 2022
Bahasa
No Classification
-
Literature Searching Service
Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)
Prarancangan pabrik Papan Partikel ini menggunakan bahan baku tandan kosong kelapa sawit dan Polyester. Kapasitas produksi pabrik ini adalah 125.000 Ton/Tahun dengan hari kerja 330 hari/tahun. Pabrik ini direncanakan didirikan di
Desa Lingkuang Aua, Kecamatan Pasaman, Kabupaten Pasaman Barat, Sumatera Barat dengan luas tanah 21.130 m2. Bentuk perusahaan yang direncanakan adalah Perseroan Terbatas (PT) dengan menggunakan metode struktur organisasi garis dan staf (tenaga kerja sebanyak 124 orang). Sumber air pabrik ini berasal dari Sungai Batang Pasaman, Kecamatan Pasaman, Kabupaten Pasaman Barat dengan total kebutuhan air sebesar 74.664,631 kg/jam, dan untuk kebutuhan listrik diperoleh dari Perusahaan Listrik Negara (PLN) dan generator dengan daya 1.300,217 kW.
Hasil analisa ekonomi yang diperoleh adalah sebagai berikut:
1. Fixed Capital Investment (FCI) = Rp. 391.934.160.027,-
2. Working Capital Investment (WCI) = Rp. 69.164.851.769,-
3. Total Capital Investment (TCI) = Rp. 461.099.011.796,-
4. Total Production Cost (TPC) = Rp. 924.921.028.572,-
5. Sales Cost (SC) = Rp. 1.094.020.620.966,-
6. Laba Bersih = Rp. 126.824.694.295,-
7. Pay Out Time (POT) = 4,76 tahun
8. Break Event Point (BEP) = 40,98%
9. Internal Rate of Return (IRR) = 22,03%
10. Rate Of Return (ROR) = 28%
Particle Board plant design uses oil palm empty fruit bunches and Polyester as raw materials. The production capacity of this factory is 125.000 tons/year with 330 working days/year. The location of the factory is planned to be established in Lingkuang Aua Village, Pasaman District, West Pasaman Regency, West Sumatra with a land area of 21.130 m2. The planned form of this company is an Incorporated (Inc.) using the line and staff structure method (a workforce of 124 people). The water source for this factory comes from the Batang Pasaman River, Pasaman District, West Pasaman Regency with a total water needed is 74.664,631kg/hour, and for electricity needs it is obtained from the State Electricity Company (PLN) and a generator with a power of 1.300,217 kW.The result of the economic analysis obtained are as follows: 1. Fixed Capital Investment = Rp. 391.934.160.027,- 2. Working Capital Investment = Rp. 69.164.851.769,- 3. Total Capital Investment = Rp. 461.099.011.796,- 4. Total Production Cost = Rp. 924.921.028.572,- 5. Sales Cost = Rp. 1.094.020.620.966,- 6. Net Profit = Rp. 126.824.694.295,- 7. Pay Out Time = 4,76 years 8. Break Event Point = 40,98% 9. Internal Rate of Return = 22,03% 10. Rate Of Return = 28%
ANALISIS SIFAT FISIK DAN MEKANIK PAPAN PARTIKEL TANDAN KOSONG KELAPA SAWIT DENGAN PEREKAT UREA FORMALDEHIDA (Muhammad Havist Rihanda, 2023)
PRARANCANGAN PABRIK PAPAN PARTIKEL DARI TANDAN KOSONG KELAPA SAWIT DAN POLYESTER DENGAN KAPASITAS PRODUKSI 125.000 TON/TAHUN (MUHAMAD TAUFIK, 2022)
PRARANCANGAN PEMBANGKIT LISTRIK DESENTRALISASI DARI TANDAN KOSONG KELAPA SAWIT (TKKS) DENGAN KAPASITAS PRODUKSI 5 MWH (Erva Yulia Ningsih, 2024)
PRARANCANGAN PEMBANGKIT LISTRIK DESENTRALISASI DARI TANDAN KOSONG KELAPA SAWIT (TKKS) DENGAN KAPASITAS PRODUKSI 5 MWH (Ninda fadhliah, 2024)
PRARANCANGAN PABRIK PULP DARI TANDAN KOSONG KELAPA SAWIT (TKKS) DENGAN PROSES SODA MENGGUNAKAN ENZIM LAKASE DENGAN KAPASITAS PRODUKSI 500.000 TON/TAHUN (Anisa Luthfiana, 2022)