Electronic Theses and Dissertation
Universitas Syiah Kuala
Baca Juga : OPTIMALISASI LOAD IN DAN LOAD OUT COAL HANDLING FACILITY (CHF) 3 SITE BANKO BARAT DI PT BUKIT ASAM, TBK., TANJUNG ENIM, SUMATERA SELATAN (Ida Fithri, 2018)
Baca Juga : EVALUASI JAM KERJA EFEKTIF DAN KESERASIAN KERJA ALAT GALI MUAT KOMATSU PC 800 SE DENGAN ALAT ANGKUT SCANIA P 420 PADA PENAMBANGAN BATU BARA PIT 1 TIMUR BANKO BARAT PT BUKIT ASAM (PERSERO) TBK (MUHAMMAD FADHIL, 2018)
Baca Juga : PERBANDINGAN LOAD BALANCING APACHE DEFAULT DENGAN LOAD BALANCING APACHE YANG TELAH DIOPTIMALISASI PADA LINUX VIRTUAL SERVER (Hendra Julian, 2024)
Baca Juga : OPTIMALISASI LERENG GALIAN BANKO BARAT PIT 2 TAHUN 2016 DI PT. BUKIT ASAM (PERSERO), TBK. UNIT PERTAMBANGAN TANJUNG ENIM, PROVINSI SUMATERA SELATAN (Zati Hulwani, 2016)
Baca Juga : ANALISIS OPTIMASI OWNING OPERATING COST (OOC) ALAT ANGKUT DUMPTRUCK VOLVO FMX 440 DALAM KEGIATAN COAL HAULING DI PIT 2 BANKO BARAT PT BUKIT ASAM, TANJUNG ENIM, SUMATERA SELATAN (FARHAN SURYA WARDHANA, 2026)