Electronic Theses and Dissertation
Universitas Syiah Kuala
Baca Juga : OPTIMALISASI LERENG GALIAN BANKO BARAT PIT 2 TAHUN 2016 DI PT. BUKIT ASAM (PERSERO), TBK. UNIT PERTAMBANGAN TANJUNG ENIM, PROVINSI SUMATERA SELATAN (Zati Hulwani, 2016)
Baca Juga : EVALUASI JAM KERJA EFEKTIF DAN KESERASIAN KERJA ALAT GALI MUAT KOMATSU PC 800 SE DENGAN ALAT ANGKUT SCANIA P 420 PADA PENAMBANGAN BATU BARA PIT 1 TIMUR BANKO BARAT PT BUKIT ASAM (PERSERO) TBK (MUHAMMAD FADHIL, 2018)
Baca Juga : FAKTOR KEAMANAN TERHADAP STABILITAS LERENG DAN KONSTRUKSI DINDING PENAHAN TANAH TIPE COUNTERFORT (STUDI KASUS RUAS JALAN BABAHROT-BLANGKEJEREN STA 13+850-STA 13+895) (Karsa Ciptaning, 2018)
Baca Juga : KESTABILAN LERENG PADA SUNGAI AIH TRIPE DESA KENDAWI KABUPATEN GAYO LUES AKIBAT BEBAN GEMPA STATIS (Ikhwanulkiram, 2016)
Baca Juga : PERBANDINGAN EFISIENSI BIAYA SEWA ALAT EXCAVATOR KOMATSU PC400 MENGGUNAKAN SISTEM MONITORING RITASE DI MTBU PT BUKIT ASAM TBK (M ZAKI MUBARAK, 2019)