Electronic Theses and Dissertation
Universitas Syiah Kuala
Baca Juga : ANALISIS RISIKO PENAWARAN UNDERESTIMATE COST TERHADAP KUALITAS PROYEK KONSTRUKSI JALAN DI PROVINSI ACEH (Hamdani, 2016)
Baca Juga : ANALISIS FAKTOR-FAKTOR PEMBENGKAKAN BIAYA (COST OVERRUN) YANG BERPENGARUH TERHADAP KETIDAKPASTIAN BIAYA (CONTINGENCY COST) PADA PROYEK IRIGASI DI KABUPATEN ACEH BESAR (Bima Risandi, 2016)
Baca Juga : IDENTIFIKASI FAKTOR DOMINAN RISIKO BIAYA PADA PELAKSANAAN PROYEK KONSTRUKSI GEDUNG DI BANDA ACEH (YOSI ARMIDA, 2020)
Baca Juga : ANALISIS PENYEBAB TIME DELAYS DAN COST OVERRUNS DALAM PELAKSANAAN PROYEK KONSTRUKSI BANGUNAN GEDUNG DI KOTA BANDA ACEH (Muhammad Siswanto, 2015)
Baca Juga : METODE ESTIMASI BIAYA KONSEPTUAL PADA PROYEK KONSTRUKSI GEDUNG SEKOLAH (Azwir, 2024)