Electronic Theses and Dissertation
Universitas Syiah Kuala
Baca Juga : ANALISA ALIRAN DAYA SISTEM KELISTRIKAN 20 KV SUBULUSSALAM TERHADAP INTERKONEKSI PEMBANGKIT LISTRIK TENAGA BIOMASSA (PLTBM) SUBULUSSALAM 10 MW (Rayhan Muhammad, 2025)
Baca Juga : OPTIMASI BIAYA PEMBANGKIT LISTRIK MENGGUNAKAN METODE ALGORITMA GENETIK DENGAN FUNGSI OBJEKTIF RUGI-RUGI TRANSMISI (Rian Dwika Yuriki, 2019)
Baca Juga : SIMULASI PEMANFAATAN DISTRIBUTED GENERATION (DG) PADA JARINGAN DISTRIBUSI 20 KV DENGAN ETAP 7.0.0 DI PT.PLN (PERSERO) RANTING KUTACANE (Saddam Rijal Kasmi, 2015)
Baca Juga : STUDI INTEGRASI DISTRIBUTED GENERATION PADA SALURAN DISTRIBUSI PLN DI KRUENG RAYA (Renno Kamal Putra, 2016)
Baca Juga : PENGARUH SIMULASI LOAD FREQUENCY CONTROL (LFC) DAN AUTOMATIC VOLTAGE REGULATOR (AVR) PADA SISTEM TENAGA LISTRIK (Afrinurizal, 2024)