DARA PERMATA ALENDTI, PRARANCANGAN PABRIK MAGNESIUM KARBONAT (MGCO3) DARI DOLOMIT DENGAN PRODUK SAMPING KALSIUM KARBONAT (CACO3) KAPASITAS 300.000 TON/TAHUN. Banda Aceh Fakultas Teknik Kimia,2026

Prarancangan pabrik magnesium karbonat (mgco₃) dari dolomit dengan proses hidrasi dan karbonisasi dirancang berkapasitas 300.000 ton/tahun dan beroperasi 330 hari/tahun. pabrik berlokasi di desa temandang, kecamatan merakurak, kabupaten tuban, provinsi jawa timur dengan luas lahan 24.085 m². bentuk badan usaha yang dipilih adalah perseroan terbatas (pt) dengan struktur organisasi garis dan staf serta kebutuhan tenaga kerja sebanyak 180 orang. produk utama yang dihasilkan adalah magnesium karbonat (mgco₃) berkadar 98% sebesar 300.000 ton/tahun dan produk samping kalsium karbonat (caco₃) berkadar 89% sebesar 389.952,31 ton/tahun. kebutuhan air dipenuhi dari sungai bengawan solo sebesar 107.968,49 kg/jam, sedangkan kebutuhan listrik sebesar 1.171,72 kw dipasok dari pln dengan generator sebagai cadangan. kebutuhan bahan bakar solar untuk generator sebesar 145,42 l/jam. hasil analisa ekonomi yang diperoleh adalah sebagai berikut: 1. modal investasi tetap = rp 644.271.008.234,45 2. modal kerja 3. total modal investasi 4. total biaya produksi 5. hasil penjualan 6. laba bersih 7. waktu pengembalian modal 8. tingkat pengembalian internal 9. titik impas = rp 71.585.667.581,63 = rp 715.856.675.816,08 = rp 1.088.770.283.723,95/tahun = rp 1.282.980.012.785,00/tahun = rp 136.256.778.834,60/tahun = 2,87 tahun = 34% = 36,07% berdasarkan studi kelayakan teknis dan ekonomis yang telah dilakukan, dapat disimpulkan bahwa prarancangan pabrik magnesium karbonat (mgco₃) dari dolomit dengan proses hidrasi dan karbonisasi layak untuk dilanjutkan ke tahap perancangan dan pembangunan pabrik. selain itu, pabrik ini diharapkan dapat memenuhi kebutuhan magnesium karbonat dalam negeri serta meningkatkan nilai tambah sumber daya dolomit di indonesia.



Abstract

The preliminary design of a Magnesium Carbonate (MgCO₃) plant from dolomite via hydration and carbonation processes is proposed with a production capacity of 300,000 tons/year operating 330 days/year. The plant is to be located in Temandang Village, Merakurak District, Tuban Regency, East Java Province, Indonesia, covering an area of 24,085 m². The selected business entity is a Limited Liability Company (Perseroan Terbatas/PT) with a line-and-staff organizational structure and a total workforce of 180 employees. The main product is Magnesium Carbonate (MgCO₃) at 98% purity with an annual output of 300,000 tons/year. The by-product is Calcium Carbonate (CaCO₃) at 89% purity with an output of 389,952.31 tons/year. Process water totalling 107,968.49 kg/h is sourced from the Bengawan Solo River. Electrical power demand is 1,171.72 kW, supplied by the state electricity company (PLN) with an on-site generator as backup. Diesel fuel consumption for the generator is estimated at 145.42 L/h. The economic evaluation yielded the following key indicators: 1. Fixed Capital Investment = Rp 644,271,008,234.45 2. Working Capital Investment 3. Total Capital Investment 4. Total Production Cost 5. Sales Revenue 6. Net Profit 7. Pay Out Time (POT) 8. Internal Rate of Return (IRR) Break-even Point (BEP) = Rp 71,585,667,581.63 = Rp 715,856,675,816.08 = Rp 1,088,770,283,723.95/tahun = Rp 1,282,980,012,785/tahun = Rp 136,256,778,834.60/tahun = 2,87 tahun = 34% = 36.07% Based on the technical and economic feasibility studies conducted, the preliminary design of the Magnesium Carbonate (MgCO₃) plant from dolomite via hydration and carbonation processes is deemed feasible for further engineering and construction development. The plant is expected to satisfy domestic demand for Magnesium Carbonate while enhancing the value-added utilization of Indonesia's dolomite resources.



    SERVICES DESK