AMIRATUD DIANA, PENGARUH FAKTOR OPERASIONAL DAN LOGISTIK DALAM GALANGAN KAPAL TRADISIONAL MENGGUNAKAN METODE FUZZY TIME SERIES CHENG (STUDI KASUS: LAMPULO, BANDA ACEH). Banda Aceh Fakultas Kelautan dan perikanan,2025

Penelitian ini mengkaji pengaruh faktor operasional dan logistik pada galangan kapal tradisional di lampulo, banda aceh, dengan tujuan mendeskripsikan waktu penyelesaian kapal, menerapkan metode fuzzy time series cheng untuk peramalan, dan mengukur keakuratan hasil peramalan tersebut. menggunakan data historis durai penyelesaian kapal per unit dari januari 2021 hingga desember 2024 yang dikumpulkan melalui observasi dan wawancara, penelitian ini menemukan pola musiman yang signifikan dalam waktu penyelesaian, dengan efisiensi tertinggi pada juni 2022 (47 hari) dan terendah pada desember 2021 (147 hari) akibat faktor cuaca dan rantai pasokan. penerapan metode fuzzy time series cheng berhasil memprediksi waktu penyelesaian kapal untuk januari 2025 sebesar 89 hari, dengan tingkat keakuratan yang sangat baik, ditunjukkan oleh nilai mean absolute percentage error (mape) sebesar 4.45%. kata kunci: galangan kapal tradisional, faktor operasional, logistik, fuzzy time series cheng, peramalan, mape



Abstract

This study examines the influence of operational and logistical factors in traditional shipyards in Lampulo, Banda Aceh, aiming to describe ship completion times, apply the Fuzzy Time Series Cheng method for forecasting, and measure the accuracy of the forecasting results. Using historical data on ship completion time per unit from January 2021 to December 2024, collected through observation and interviews, the study found significant seasonal patterns in completion times, with the highest efficiency in June 2022 (47 days) and the lowest in December 2021 (147 days) due to weather and supply chain factors. The application of the Fuzzy Time Series Cheng method successfully predicted the ship completion time for January 2025 to be 89 days, with excellent accuracy, indicated by a Mean Absolute Percentage Error (MAPE) value of 4.45%. Keywords: Traditional Shipyard, Operational Factors, Logistics, Fuzzy Time Series Cheng, Forecasting, MAPE.



    SERVICES DESK