Muhammad Rizqullah Akram Harahap, STUDI PENELUSURAN ALIRAN (FLOW ROUTING) PADA KOLAM RETENSI OXBOW DI DAS KRUENG KEUREUTO. Banda Aceh Fakultas Teknik Sipil,2025

Kolam retensi oxbow lake memainkan peran krusial dalam menjamin ketersediaan air untuk kebutuhan di hilir. dengan mengatur pelepasan air dari kolam retensi oxbow lake, variabilitas temporal aliran dapat dikurangi. kolam retensi oxbow lake krueng keureuto berlokasi di das krueng keureuto. sistem pengoperasian kolam retensi oxbow lake krueng keureuto untuk menyuplai kebutuhan air baku. selain itu sistem kolam retensi memerlukan sistem pelimpah untuk menjaga keamanan kolam dari overtopping pada kondisi penanganan kelebihan air. maka penelitian ini bertujuan untuk menganalisis penelusuran banjir kolam retensi oxbow lake keureuto. kapasitas maksimum pelimpah dirancang berdasarkan debit banjir rancangan. berdasarkan hasil penelitian diperoleh debit banjir periode ulang sebesar 725,92 m³/detik. debit ini dikurangi dengan adanya floodway di arah hulu, sehingga debit periode ulang 2 tahun menjadi 600 m³/detik. berdasarkan penelusuran banjir diketahui elevasi puncak muka air banjir pada inlet sebesar +8,72 mdpl, maka dibangun tanggul disekitar kolam dengan tinggi 2 m atau pada ketinggian +9 mdpl. dengan debit makssimum 64,42 m³/detik .untuk dapat memanfaatkan volume kolam semaksimal mungkin maka dibangun spillway inlet pada elevasi +8 mdpl dengan luas 63 meter. hasil routing pada kolam menunjukan pada jam 11 kolam sudah penuh dan air harus dikeluarkan sebesar 5,3 m³/detik, maka diperlukan spillway outlet dengan lebar 4 meter. pada outlet juga disediakan pintu air dengan lebar 1 m untuk flushing sedimen. kolam retensi oxbow ini dapat memangkas puncak banjir sebesar 64,433 m³/detik atau seebsar 11 % dari debit puncak banjir rencana. hasil tampungan air pada kolam selanjutnya dapat dimanfaatkan untuk kebutuhan air baku dan air irigasi.



Abstract

The oxbow lake retention pond plays a crucial role in ensuring water availability for downstream needs. By regulating the water release from the oxbow lake retention pond, the temporal variability of the flow can be reduced. The Krueng Keureuto Oxbow Lake Retention Pond is located in the Krueng Keureuto Watershed. The operational system of the Krueng Keureuto Oxbow Lake Retention Pond is designed to supply raw water needs. Additionally, the retention pond system requires a spillway system to safeguard the pond from overtopping during excess water conditions.This study aims to analyze flood routing in the Krueng Keureuto oxbow lake retention pond. The maximum capacity of the spillway is designed based on the design flood discharge. Based on the research findings, a design flood discharge with a return period of 725.92 m³/s was obtained. This discharge is reduced by the presence of floodway upstream, resulting in a 2-year return period discharge of 600 m³/s.Flood routing analysis revealed that the peak floodwater elevation at the inlet is +8.72 meters above sea level (masl), prompting the construction of a 2-meter-high embankment around the pond, reaching an elevation of +9 masl, with maximum inflow in 64,42.To optimize the pond's volume, an inlet spillway is constructed at an elevation of +8 masl with an area of 63 meters. Routing results indicate that the pond is filled by 11 a.m., necessitating a water release of 5.3 m³/s. Thus, an outlet spillway with a width of 4 meters is required. The outlet is also equipped with a 1-meter-wide sluice gate for sediment flushing.This oxbow retention pond can reduce peak flood discharge by 64.433 m³/s or 11% of the planned peak flood discharge. The retained water in the pond can subsequently be utilized for raw water and irrigation needs.



    SERVICES DESK