ANALISIS PRODUKTIVITAS DAN OPTIMASI KONFIGURASI FLEET RNALAT GALI MUAT DAN ALAT ANGKUT BERBASIS SIMULASI RNMONTE CARLO DI PIT BARAT PT ANTAREJA MAHADA MAKMUR RNJOBSITE PT MIFA BERSAUDARA, ACEH BARAT
Pengarang
Muhammad Darmawi - Personal Name;
Dosen Pembimbing
Mulkal - 198010162012121003 - Dosen Pembimbing I
Haqul Baramsyah - 198411282015041002 - Dosen Pembimbing II
Nomor Pokok Mahasiswa
2104108010019
Fakultas & Prodi
Fakultas Teknik / Teknik Pertambangan (S1) / PDDIKTI : 31201
Subject
Kata Kunci
Penerbit
Banda Aceh : Fakultas Teknik Pertambangan., 2026
Bahasa
No Classification
-
Literature Searching Service
Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)
Kegiatan coal getting memerlukan keseimbangan kerja antara alat gali-muat dan
alat angkut agar proses produksi dapat berjalan secara efektif. Pada kondisi aktual
di Pit Barat PT Antareja Mahada Makmur Jobsite PT Mifa Bersaudara,
produktivitas alat berat masih belum mencapai target perusahaan. Hal ini
dipengaruhi oleh variasi cycle time, efisiensi kerja yang belum optimal, serta
ketidakseimbangan jumlah alat dalam fleet yang menyebabkan waktu tunggu pada
proses pemuatan dan pengangkutan. Penelitian ini bertujuan untuk menganalisis
produktivitas alat berat serta menentukan konfigurasi fleet yang optimal
menggunakan pendekatan simulasi Monte Carlo. Metode yang digunakan meliputi
perhitungan produktivitas aktual, analisis match factor, serta simulasi Monte Carlo
untuk mengevaluasi pengaruh variabilitas cycle time dan efisiensi kerja terhadap
produktivitas sistem. Hasil penelitian menunjukkan bahwa produktivitas aktual
excavator Komatsu PC 500 sebesar 149,91 ton/jam dan dump truck sebesar 23,14
ton/jam, yang masih berada di bawah target perusahaan. Nilai match factor aktual
sebesar 1,17 menunjukkan kondisi over-matched yang menyebabkan terjadinya
antrian dump truck di area loading. Berdasarkan hasil analisis dan simulasi,
konfigurasi fleet yang paling optimal adalah 1 unit excavator dan 5 unit dump truck
dengan nilai match factor sebesar 0,922 yang berada dalam kisaran optimal.
Konfigurasi tersebut mampu meningkatkan keseimbangan kerja alat dan kinerja
sistem produksi. Namun demikian, hasil produksi yang diperoleh masih belum
sepenuhnya mencapai target perusahaan, sehingga diperlukan upaya perbaikan
operasional lanjutan untuk meningkatkan produktivitas secara optimal.
Coal getting activities require a proper balance between loading and hauling equipment to ensure an effective production process. Under actual conditions at Pit Barat PT Antareja Mahada Makmur Jobsite PT Mifa Bersaudara, the productivity of heavy equipment has not yet met the company’s target. This condition is influenced by variations in cycle time, suboptimal work efficiency, and an imbalance in fleet composition, which leads to waiting time during loading and hauling processes. This study aims to analyze the productivity of heavy equipment and determine the optimal fleet configuration using the Monte Carlo simulation approach. The methods used include actual productivity calculation, match factor analysis, and Monte Carlo simulation to evaluate the effect of cycle time variability and work efficiency on system productivity. The results show that the actual productivity of the Komatsu PC 500 excavator is 149.91 tons/hour, while the dump truck productivity is 23.14 tons/hour, both of which are still below the company’s targets. The actual match factor value of 1.17 indicates an over-matched condition, resulting in dump truck queuing at the loading area. Based on the analysis and simulation results, the optimal fleet configuration is 1 excavator and 5 dump trucks, with a match factor value of 0.922, which falls within the optimal range. This configuration improves the balance between loading and hauling equipment and enhances overall system performance. However, the production achieved still does not fully meet the company’s target, indicating that further operational improvements are required to optimize productivity.
ANALISIS PRODUKTIVITAS EXCAVATOR CATERPILLAR 395 DAN OFF-HIGHWAY TRUCK CATERPILLAR 777E PADA KEGIATAN COAL GETTING PIT MONTEGI BAWAH PT ANTAREJA MAHADA MAKMUR JOBSITE PT MIFA BERSAUDARA (Muhammad Raihan, 2025)
KAJIAN TEKNIS PRODUKSI ALAT GALI MUAT DAN ANGKUT PENAMBANGAN BATUBARA PT MIFA BERSAUDARA (T RYO ROSMANDA PARASAMIA, 2018)
OPTIMASI PRODUKTIVITAS ALAT ANGKUT PADA KEGIATAN COAL GETTING DI PT MIFA BERSAUDARA, KABUPATEN ACEH BARAT, ACEH (RIDHO PRAMUDIKA ARWINDA, 2025)
KAJIAN TEKNIS PRODUKSI ALAT GALI-MUAT DAN ALAT ANGKUT PADA PENGANGKUTAN BATUBARA PT MIFA BERSAUDARA KABUPATEN ACEH BARAT, ACEH (Chairunnas, 2018)
ANALISIS PENINGKATAN PRODUKTIVITAS ALAT GALI MUAT DAN ALAT ANGKUT PADA KEGIATAN PENGUPASAN OVERBURDEN DI PIT TIMUR PT ANTAREJA MAHADA MAKMUR SITE PT MIFA BERSAUDARA, ACEH BARAT (Tara Fransiska, 2026)