PRELIMINARY PLANT DESIGN OF PORTLAND POZZOLAN CEMENT (PPC) BASED ON COAL ASH WITH A PRODUCTION CAPACITY OF 4.000.000 TONS/YEAR | ELECTRONIC THESES AND DISSERTATION

Electronic Theses and Dissertation

Universitas Syiah Kuala

    SKRIPSI

PRELIMINARY PLANT DESIGN OF PORTLAND POZZOLAN CEMENT (PPC) BASED ON COAL ASH WITH A PRODUCTION CAPACITY OF 4.000.000 TONS/YEAR


Pengarang

Putri Irda Utami - Personal Name;

Dosen Pembimbing

Abrar Muslim - 197205251999031002 - Dosen Pembimbing I
Syahiddin DS - 195512051987021001 - Dosen Pembimbing II



Nomor Pokok Mahasiswa

2004103010007

Fakultas & Prodi

Fakultas Teknik / Teknik Kimia (S1) / PDDIKTI : 24201

Subject
-
Kata Kunci
-
Penerbit

Banda Aceh : Fakultas Teknik Kimia., 2025

Bahasa

No Classification

-

Literature Searching Service

Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)

Prarancangan pabrik Portland Pozzolan Cement (PPC) menggunakan bahan baku berupa batu kapur, tanah liat, pasir besi, dan pasir silika, serta bahan aditif berupa gypsum dan coal ash (fly ash dan bottom ash) sebagai pozzolan pada semen tersebut. Penggunaaan coal ash ini bertujuan untuk memanfaatkan limbah hasil pembakaran batu bara pada PLTU Paiton. Kapasitas produksi pabrik ini adalah 4.000.000 ton/tahun dengan waktu operasi 330 hari/tahun dan 24 jam/hari. Bentuk perusahaan yang direncanakan adalah Perseroan Terbatas (PT) dengan menggunakan metode struktur organisasi garis dan staf. Kebutuhan tenaga kerja untuk menjalankan perusahaan ini berjumlah 170 orang. Pabrik ini direncanakan didirikan di Kabupaten Bangkalan, Jawa Timur dengan luas tanah 84.149 m2. Sumber air pabrik ini berasal dari PDAM Bangkalan, sedangkan listrik diperoleh dari Perusahaan Listrik Negara (PLN) dan generator diesel dengan daya 8,1 MW.
Hasil Analisis ekonomi yang diperoleh adalah sebagai berikut:
Fixed Capital Investment (FCI) = Rp 1.383.892.341.228
Working Capital Investment (WCI) = Rp 345.973.085.307
Total Capital Investment (TCI) = Rp1.729.865.426.535
Total Production Cost (TPC) = Rp5.017.222.064.381
Salling Cost (SC) = Rp5.852.645.812.574
Laba Bersih = Rp 651.630.523.590
Pay Out Time (POT) = 3,7 tahun
Break Event Point (BEP) = 45,94%
Internal Rate of Return (IRR) = 28,59%
Rate of Return = 37,67%
Berdasarkan studi kelayakan teknis dan ekonomis diatas, maka dapat disimpulkan bahwa prarancangan pabrik PPC ini layak untuk dilanjutkan ke tahap rancangan.

The Portland Pozzolan Cement (PPC) factory design uses raw materials in the form of limestone, clay, iron sand and silica sand, as well as additives in the form of gypsum and coal ash (fly ash and bottom ash) as pozzolan in the cement. The aim of using coal ash is to utilize waste from burning coal at the Paiton PLTU. The production capacity of this factory is 4.000.000 tons/year with an operating time of 330 days/year and 24 hours/day. The planned company form is a Limited Liability Company (PT) using the line and staff organizational structure method. The workforce required to run this company is 170 people. This factory is planned to be established in Bangkalan Regency, East Java with a land area of 84,149 m2. The plant’s water supply will come from PDAM Bangkalan, while electricity is obtained from the State Electricity Company (PLN) and a diesel generator with capacity of 8.1 MW. Fixed Capital Investment (FCI) = Rp 1.383.892.341.228 Working Capital Investment (WCI) = Rp 345.973.085.307 Total Capital Investment (TCI) = Rp1.729.865.426.535 Total Production Cost (TPC) = Rp5.017.222.064.381 Salling Cost (SC) = Rp5.852.645.812.574 Net Profit = Rp 651.630.523.590 Pay Out Time (POT) = 3,7 years Break Event Point (BEP) = 45,94% Internal Rate of Return (IRR) = 28,59% Rate of Return = 37,67% Based on the technical and economic feasibility studies above, it can be concluded that the preliminary design of the PPC plant is feasible to proceed to the design stage.