Electronic Theses and Dissertation
Universitas Syiah Kuala
SKRIPSI
PERBANDINGAN RANCANGAN PIT BERDASARKAN BLOCK MODEL HASIL OPTIMASI DAN BLOCK MODEL TANPA OPTIMASI DI FERRARY HILL PIT FPB07 PT VALE INDONESIA TBK
Pengarang
Aisyah Rabiatul Nilda - Personal Name;
Dosen Pembimbing
Haqul Baramsyah - 198411282015041002 - Dosen Pembimbing I
Nomor Pokok Mahasiswa
2004108010013
Fakultas & Prodi
Fakultas Teknik / Teknik Pertambangan (S1) / PDDIKTI : 31201
Subject
Kata Kunci
Penerbit
Banda Aceh : ., 2024
Bahasa
No Classification
-
Literature Searching Service
Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)
PT Vale Indonesia Tbk merupakan perusahaan pertambangan dan pengolahan nikel yang proses penambangannya menggunakan metode open cast mining. Agar menghasilkan produk akhir berupa nikel dalam bentuk matte, maka diperlukan desain pit yang sesuai dengan standar operasional perusahaan. Pembuatan desain pit penambangan menggunakan software Vulcan, didesain dari elevasi terendah menuju elevasi tertinggi (manual pit). Pembuatan manual pit ini dapat dilakukan langsung dengan mendesain block model tanpa melakukan pit optimasi terlebih dahulu. Namun cara tersebut tidak memperhitungkan biaya yang akan dikeluarkan, sehingga perlu melakukan pit optimasi penambangan yang memperhatikan nilai Net Present Value (NPV) sebagai acuan utama. Desain pit penambangan yang hasil akhirnya berupa tonase material akan memiliki hasil yang berbeda apabila dibandingkan dari segi pembuatan desain pit tanpa optimasi dan desain pit dari hasil optimasi. Tujuan penelitian adalah membandingkan hasil rancangan pit optimasi dan pit tanpa optimasi. Data yang digunakan dalam penelitian ini adalah data topografi dan data block model daerah penelitian serta parameter teknis rancangan tambang. Desain pit dilakukan dengan menggunakan aplikasi Maptek Vulcan dan proses optimasi menggunakan metode Lerchs Grossmann. Perhitungan cadangan, biaya, pendapatan dan keuntungan dihitung menggunakan aplikasi Microsoft Excel. Cadangan nikel yang dihasilkan dari pit optimasi sebesar 778.078 ton dengan material buangan sebesar 1.924.974 ton dan pit tanpa optimasi menghasilkan cadangan sebesar 1.154.872 ton dan material buangan sebesar 2.460.264 ton. Hal tersebut, disebabkan pada pit optimasi memiliki luasan yang lebih kecil dibandingkan pit tanpa optimasi sehingga cadangan yang dihasilkan juga lebih sedikit.
PT Vale Indonesia Tbk is a nickel mining and processing company whose mining process uses the open cast mining method. In order to produce the final product in the form of nickel in matte form, it is necessary to design the pit in accordance with the company's operational standards. Making mining pit design using Vulcan software, designed from the lowest elevation to the highest elevation (manual pit). Manual pit design can be done directly by designing a block model without doing pit optimization first. However, this method does not take into account the costs that will be incurred, so it is necessary to conduct mining pit optimization that takes into account the Net Present Value (NPV) value as the main reference. Mining pit design, the end result of which is material tonnage, will have different results when compared in terms of making pit design without optimization and pit design from optimization results. The research objective is to compare the results of pit design optimization and pit without optimization. The data used in this study are topographic data and block model data of the study area as well as technical parameters of mine design. Pit design was carried out using the Maptek Vulcan application and the optimization process using the Lerchs Grossmann method. Calculation of reserves, costs, revenues and profits were calculated using Microsoft Excel application. Nickel reserves generated from the optimization pit amounted to 778,078 tons with waste material of 1,924,974 tons and the pit without optimization produced reserves of 1,154,872 tons and waste material of 2,460,264 tons. This is because the optimization pit has a smaller area than the pit without optimization so that the reserves produced are also less.
DESAIN PIT DAN PUSHBACK TAHUNAN PENAMBANGAN NIKEL AREA EAST BLOCK KATHRYN 02 PT VALE INDONESIA TBK (HAFIZUL RIFKI HAWARI, 2018)
OPTIMASI CETAKAN INJEKSI MOLDING PADA UNIT PENGOLAHAN LIMBAH PLASTIK DINAS KEBERSIHAN DAN PERTAMANAN KOTA BAND A ACEH (Eddi Safrijal, 2023)
OPTIMASI LINEAR FRACTIONAL PROGRAMMING MENGGUNAKAN METODE CHARNES AND COOPER (Anggi Sulistiani, 2024)
ANALISIS HIGH AVAILABLITY APACHE LOAD BALANCER DAN REPLIKASI MYSQL UNTUK OPTIMALISASI WEB SERVER (Mulyadi, 2018)
ANALISIS OPTIMASI MENGGUNAKAN SOFTWARE SIMULASI FEXIM PADA SISTEM PEMINDAHAN BATUBARA AREA PORT OPERATION PT. MIFA BERSAUDARA (M ANGGA FACHREZI, 2024)