TINJAUAN KAPASITAS-PRODUKSI DAN UMUR WADUK PADA BENDUNGAN RUKOH
Pengarang
AMBIYA RIZKILLAH - Personal Name;
Dosen Pembimbing
Alfiansyah Yulianur BC - 196307251991021001 - Dosen Pembimbing I
Ziana - 197503182000122001 - Dosen Pembimbing II
Nomor Pokok Mahasiswa
1704101010042
Fakultas & Prodi
Fakultas Teknik / Teknik Sipil (S1) / PDDIKTI : 22201
Subject
Kata Kunci
Penerbit
Banda Aceh : Fakultas Teknik (S1)., 2022
Bahasa
Indonesia
No Classification
627.8
Literature Searching Service
Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)
Kabupaten Pidie sering mengalami masalah ketersediaan air. Air tersedia sebagian besar berasal dari Sungai Krueng Baro Geunik dan Sungai Krueng Tiro. Keberadaan air dari sumber-sumber tersebut melimpah pada musim hujan dan menjadi sangat terbatas pada musim kemarau. Oleh karena itu, perlu dilakukan penampungan kelebihan air untuk digunakan di saat kekurangan air, salah satunya yaitu melalui pembangunan bendungan Rukoh. DAS yang direncanakan sebagai daerah tampungan air waduk yaitu Sungai Krueng Rukoh dengan Sungai Krueng Tiro sebagai sumber pasokan airnya. Simpanan air pada bendungan Rukoh diharapkan dapat memenuhi kebutuhan air irigasi Baro Raya dan Tiro. Tujuan dari Tugas Akhir ini adalah melakukan tinjauan perencanaan kapasitas-produksi air waduk pada bendungan Rukoh berdasarkan kondisi topografi, data klimatologi, dan data curah hujan sehingga bendungan Rukoh diharapkan dapat mendukung kebutuhan irigasi, dan air bersih. Ruang lingkup penulisan mencakup perhitungan besarnya kapasitas-produksi waduk dan analisis sedimen serta umur waduk pada bendungan rukoh. Berdasarkan hasil perhitungan, untuk kebutuhan air irigasi didapat debit pengambilan terbesar adalah 3,372 m3/dt dan terkecil 0,258 m3/dt. Kebutuhan air bersih pada tahun 2072 (umur ekonomis waduk 50 tahun) untuk 23.302 jiwa penduduk Kecamatan Titeu adalah sebesar 0,032 m3/dt dan kebutuhan hilir didapat sebesar 0,236 m3/dt. Daya listrik yang dapat dihasilkan maksimum sebesar 4,311 MW. Berdasarkan aliran masuk dan keluar, dibuat suatu simulasi tampungan yang menghasilkan tampungan efektif waduk sebesar 124.421.786,792 m3. Erosi lahan yang terjadi pada lokasi tinjauan berdasarkan metode USLE modifikasi adalah 1.216.072,839 ton/tahun dengan sedimentasi sebesar 469.634,988 m3/tahun. Umur waduk diperkirakan 247,959 tahun akibat 80% tampungan dipenuhi sedimen.
Pidie Regency often has problems with water availability. Most of the available water comes from the Krueng Baro Geunik River and the Krueng Tiro River. The availability of water from these sources is abundant in the rainy season and becomes very limited in the dry season. Therefore, it is necessary to store excess water to be used in times of water shortage, one of which is through the construction of the Rukoh dam. The watershed that is planned as a reservoir water storage area is the Krueng Rukoh River with the Krueng Tiro River as a source of water supply. Water storage in the Rukoh dam is expected to meet the needs of Baro Raya and Tiro irrigation water. The purpose of this final project is to review the planning of reservoir water production capacity at the Rukoh dam based on topographic conditions, climatological data, and rainfall data so that the Rukoh dam is expected to support irrigation and clean water needs. The scope of the writing includes the calculation of the production capacity of the reservoir and the analysis of sediment and the age of the reservoir in the Rukoh dam. Based on the calculation results, for irrigation water needs, the largest intake discharge is 3.372 m3/sec and the smallest is 0.258 m3/sec. The need for clean water in 2072 (reservoir economic age is 50 years) for 23,302 inhabitants of Titeu District is 0.032 m3/sec and downstream needs are 0.236 m3/sec. The maximum power that can be generated is 4.311 MW. Based on the inflow and outflow, a reservoir simulation was made which resulted in an effective reservoir capacity of 124,421,786.792 m3. Land erosion that occurred at the review location based on the modified USLE method was 1,216,072,839 tons/year with a sedimentation of 469,634,988 m3/year. The age of the reservoir is estimated to be 247.959 years because 80% of the reservoir is filled with sediment.
ANALISIS PENELUSURAN BANJIR (FLOOD ROUTING) OUTFLOW PELIMPAH BENDUNGAN RUKOH TERHADAP KAPASITAS SUNGAI KRUENG RUKOH KABUPATEN PIDIE (GEBIE FIRMAN KHALIQ, 2022)
PERENCANAAN WADUK KRUENG RAJUI KABUPATEN PIDIE (Armi Rumandri, 2024)
TINJAUAN STABILITAS LERENG MENGGUNAKAN METODE BISHOP PADA TUBUH WADUK RUKOH KECAMATAN TITEU KEUMALA KABUPATEN PIDIE (Cut Mayana Saputri, 2023)
PERENCANAAN WADUK KRUENG SEULIMEUM ACEH BESAR (Meri Gustian, 2024)
TINJAUAN STABILITAS REMBESAN PADA TUBUH WADUK RUKOH KECAMATAN TITEU KEUMALA KABUPATEN PIDIE (Aprilya Sabratina, 2024)