Electronic Theses and Dissertation
Universitas Syiah Kuala
SKRIPSI
PRARANCANGAN PABRIK TANIN DAN LIGNIN DARI KULIT BUAH KAKAO DENGAN KAPASITAS BAHAN BAKU 30.000 TON/TAHUN
Pengarang
Ahmad Naim - Personal Name;
Dosen Pembimbing
Nomor Pokok Mahasiswa
2104103010056
Fakultas & Prodi
Fakultas Teknik / Teknik Kimia (S1) / PDDIKTI : 24201
Subject
Kata Kunci
Penerbit
Banda Aceh : .,
Bahasa
No Classification
-
Literature Searching Service
Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)
Prarancangan pabrik tannin dan lignin ini bertujuan untuk memanfaatkan limbah kulit kakao sebagai bahan baku bernilai tambah serta memenuhi kebutuhan industri yang menggunakan tannin dan lignin sebagai bahan baku utama, seperti industri penyamakan kulit, perekat, resin, dan bahan kimia lainnya. Proses produksi yang digunakan meliputi proses ekstraksi untuk memperoleh tannin dan proses delignifikasi untuk menghasilkan lignin dari kulit kakao. Pabrik direncanakan beroperasi secara kontinyu selama 330 hari per tahun dan 24 jam per hari dengan kapasitas produksi sebesar 30.000 ton per tahun. Bentuk perusahaan yang direncanakan adalah Perseroan Terbatas (PT) dengan struktur organisasi garis dan staf. Jumlah tenaga kerja yang dibutuhkan dalam menjalankan perusahaan adalah sebanyak 143 orang. Lokasi pabrik direncanakan didirikan di Desa Sintuwulemba, Kecamatan Lage, Kabupaten Poso, Sulawesi Tengah, Indonesia, dengan luas area sebesar 25.000 m². Sumber air yang digunakan berasal dari Sungai Kali Alas dengan kebutuhan sebesar 100.302,39 kg/jam. Adapun kebutuhan listrik dipenuhi menggunakan generator dengan daya sebesar 1.413,59 kW.
Hasil analisis ekonomi diperoleh sebagai berikut:
1. Fixed Capital Investment = Rp 1.954.229.510.069
2.Working Capital Investment = Rp 488.557.377.517
3. Total Capital Investment = Rp 2.442.786.887.586
4. Total Production Cost = Rp 1.431.911.837.957
5. Sales Cost = Rp 2.446.083.622.887
6. Laba Bersih = Rp 412.658.868.931
7. Pay Out Time (POT) = 4,47 Tahun
8. Break Event Point (BEP) = 34%
9. Internal Rate of Return (IRR) = 23,55%
Berdasarkan studi kelayakan teknis dan ekonomis di atas, maka dapat disimpulkan bahwa prarancangan Pabrik Tanin dan Lignin ini layak untuk dilanjutkan ke tahap konstruksi.
Preliminary design of this tannin and lignin plant aims to utilize cocoa husk waste as a value-added raw material and to meet the needs of industries that use tannin and lignin as the main raw materials, such as the leather tanning industry, adhesives, resins, and other chemical materials. The production process used includes an extraction process to obtain tannin and a delignification process to produce lignin from cocoa husks. The plant is planned to operate continuously for 330 days per year and 24 hours per day with a production capacity of 30,000 tons per year. The planned form of company is a Limited Liability Company (PT) with a line and staff organizational structure. The number of workers required to run the company is 143 people. The plant location is planned to be established in Sintuwulemba Village, Lage District, Poso Regency, Central Sulawesi, Indonesia, with a land area of 25,000 m². The water source used comes from the Kali Alas River with a requirement of 100,302.39 kg/hour. The electricity demand is supplied using a generator with a power capacity of 1,413.59 kW. The results of the economic analysis are obtained as follows: 1. Fixed Capital Investment = Rp 1.954.229.510.069 2.Working Capital Investment = Rp 488.557.377.517 3. Total Capital Investment = Rp 2.442.786.887.586 4. Total Production Cost = Rp 1.431.911.837.957 5. Sales Cost = Rp 2.446.083.622.887 6. Net Profit = Rp 412.658.868.931 7. Pay Out Time (POT) = 4,47 Years 8. Break Event Point (BEP) = 34% 9. Internal Rate of Return (IRR) = 23,55% Based on the technical and economic feasibility study above, it can be concluded that the preliminary design of this Tannin and Lignin Plant is feasible to be continued to the construction stage.
PRARANCANGAN PABRIK TANIN DAN LIGNIN DARI KULIT BUAH KAKAO DENGAN KAPASITAS BAHAN BAKU 30.000 TON/TAHUN (Ahmad Naim, 2026)
PRARANCANGAN PABRIK TANIN DAN LIGNIN DARI KULIT KAKAO DENGAN KAPASITAS BAHAN BAKU 25.000 TON/TAHUN (TSABITAH, 2020)
PRARANCANGAN PABRIK TANIN DAN LIGNIN DARI KULIT BUAH KAKAO DENGAN KAPASITAS BAHAN BAKU 25.000 TON/TAHUN (INTAN JAUHARI, 2020)
PRARANCANGAN PABRIK TANIN DARI KULIT AKASIA DENGAN KAPASITAS PRODUKSI 30.000 TON/TAHUN (Nurazizah, 2016)
PRARANCANGAN PABRIK TANIN DARI KULIT AKASIA (ACACIA MANGIUM) DENGAN KAPASITAS PRODUKSI 30.000 TON/TAHUN (Asmaul Husna, 2016)