<?xml version="1.0" encoding="UTF-8" ?>
<modsCollection xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" xmlns:slims="http://slims.web.id" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd">
<mods version="3.3" id="129829">
 <titleInfo>
  <title></title>
 </titleInfo>
 <name type="Personal Name" authority="">
  <namePart>Miftahul Jannah</namePart>
  <role>
   <roleTerm type="text">Primary Author</roleTerm>
  </role>
 </name>
 <typeOfResource manuscript="no" collection="yes">mixed material</typeOfResource>
 <genre authority="marcgt">bibliography</genre>
 <originInfo>
  <place>
   <placeTerm type="text">Banda Aceh</placeTerm>
   <publisher>Fakultas Teknik Univesitas Syiah Kuala</publisher>
   <dateIssued>2011</dateIssued>
  </place>
 </originInfo>
 <language>
  <languageTerm type="code"></languageTerm>
  <languageTerm type="text"></languageTerm>
 </language>
 <physicalDescription>
  <form authority="gmd">Skripsi</form>
  <extent></extent>
 </physicalDescription>
 <note>ABSTRAK Prarancangan pabrik biodiesel dengan bahan baku Crude Palm Oil (CPO).. Kapasitas produksi 24.255 ton pertahun dengan hari kerja 330 hari pertahun. Bentuk perusahaan yang direncanakan adalah Perseroan Terbatas (PT) dengan menggunakan metode struktur organisasi garis dan staf. Tenaga kerja yang dibutuhkan sebanyak 162 orang. Lokasi pabrik direncanakan di Kecamatan Seruway, kabupaten Aceh Tamiang, Provinsi Aceh, Indonesia, dengan luas tanah 26.400 m2. Sumber air berasal dari Sungai Kaloy dengan total kebutuhan air sebesar 154351,87 kg/jam, serta untuk memenuhi kebutuhan listrik sebesar 913,41 kW &#13;
          Hasil analisa ekonomi yang diperoleh adalah sebagai berikut:&#13;
a.	Fixed Capital Investment                                               = Rp. 175.979.622.262,&#13;
b.	Working Capital Investment                                         =  Rp.   31.055.277.458,­ . &#13;
c.	Capital Investment                                                          = Rp. 207.034.849.720,­ &#13;
d.	Total Biaya Produksi                                                         = Rp. 196.138.639.678,­ &#13;
e.	Hasil Penjualan                                                                = Rp. 255.239.070.619,­ &#13;
f.	Laba bersih                                                                       = Rp.   59.023.600.381.­ &#13;
g.	Pay Out Time (POT)                                                         = 2.7 tahuh.&#13;
h.	Break even Point (BEP)                                                   = 35%&#13;
i.	Rate of Return (ROR)                                                       =28,51% &#13;
          Berdasarkan studi kelayakan teknis dan ekonomis di atas, maka disimpulkan bahwa prarancangan pabrik biodiesel ini layak dilanjutkan ke tahap konstruksi.&#13;
</note>
 <note type="statement of responsibility"></note>
 <classification>0</classification>
 <identifier type="isbn"></identifier>
 <location>
  <physicalLocation>ELECTRONIC THESES AND DISSERTATION Universitas Syiah Kuala</physicalLocation>
  <shelfLocator></shelfLocator>
 </location>
 <recordInfo>
  <recordIdentifier>129829</recordIdentifier>
  <recordCreationDate encoding="w3cdtf">2024-09-03 15:29:24</recordCreationDate>
  <recordChangeDate encoding="w3cdtf">2024-09-03 15:29:24</recordChangeDate>
  <recordOrigin>machine generated</recordOrigin>
 </recordInfo>
</mods>
</modsCollection>